TROPO_PATH_DELAY Exchange format v 1.2_TUVienna Format version of 2014.07.10 # # This file contains tropospheric slant and zenith path delays and wet mapping factor. # # Created by: Armin Hofmeister, Technische Universität Wien # # Created with RADIATE program developed by Armin Hofmeister # Version: 2.0_Fortran # Subversion: global_limit # # File created on: # 2025-06-25 | 15:37:58.241 # # Data content: # Ray-tracing results for session: # 250331-z25090# # Total number of observations: # 99 # Total number of different observing stations: # 3 # # Chosen ray-tracing options: # Assignment of observations to the epochs of the numerical weather model: # one_epoch_per_obs # Method of vertical interpolation (horizontal treatment): # profilewise # Method of numerical weather model usage: # Full grid information used. # Ray-tracing approach: # pwl # Station coordinate catalogue-file: # vlbi.ell # # Numerical weather model used: # Epoch 1: 2025033106 | Grib-file resolution: res_lat= 1.000 deg, res_lon= 1.000 deg # # Origin and use of the observational data: # Observational data (scan number, source, observation time, site, azimuth, elevation) # as well as pressure- and temperature-values provided in this file originate from the # AzEl-file created by VieVS. # The reported pressure- and temperature-values have not been used for the ray-tracing. # Ray-tracing used temperature- and pressure-values only from the numerical weather # model and the standard atmosphere model. # # # --------------------------------------------------------------------------------------- # ----------------------------------- File description ---------------------------------- # --------------------------------------------------------------------------------------- # # 1) Header record -- the first record line should have a signature: # TROPO_PATH_DELAY Exchange format v N.N_additional Format version of YYYY.MM.DD # stating the version and date of the format # # The header record allows to distinguish a valid file in the TROPO_PATH_DELAY # format from files in other formats. # # 2) E-records section # E-record has letter E in the first field. # It specifies the experiment name. # # 3) H-records section # H-record has letter H in the first field. # It specifies the secondary experiment name. # # 4) M-records section # M-record has letter M in the first field. # The M record keeps the model identifier. # # 5) U-records section # U-record has letter U in the first field. # The U record instructs analysis software how to use the data. # Analysis software may override this recommendation. # # 6) S-records section # S-record has letter S in the first field. # It defines the name and coordinates of each site. A site cannot be # defined more than once. # # 7) O-records section # O-record has letter O in the first field. # It defines the circumstances of the observation: # the time tag, site ID, azimuth and elevation in the local # topocentric coordinate system, surface atmospheric pressure and # surface air temperature, slant and zenith path delay and # wet mapping factor. # # Records, which start from # character, are considered as comments. # # Format of an S-record: # ---------------------- # # Field 1:1 A1 -- Record ID. Should be letter S. # field 2:3 a2 delimiter: blanks. # Field 4:11 A8 -- 8-letter long site identifier. # May contain any characters with decimal codes 32-255, but # blanks are allowed only at the end of the site identifier. # This site identifier should be unique among S-records. # This field should not necessarily have a special meaning. # field 12:13 a2 delimiter: blanks. # Field 14:26 F13.4 -- X site coordinate in a crust fixed reference frame. # Unit: meter # field 27:27 a1 delimiter: blank. # Field 28:40 F13.4 -- Y site coordinate in a crust fixed reference frame. # Unit: meter # field 41:41 a1 delimiter: blank. # Field 42:54 F13.4 -- Z site coordinate in a crust fixed reference frame. # Unit: meter # field 55:56 a2 delimiter: blanks. # Field 57:64 F8.4 -- Geodetic latitude of site, # interval: [-90; 90], positive to north. # Unit: degree # field 65:65 a1 delimiter: blank. # Field 66:73 F8.4 -- Geodetic longitude of site, # interval: [0; 360[, increasing towards east. # Unit: degree # field 74:74 a1 delimiter: blank. # Field 75:81 F7.2 -- Height of site above the reference ellipsoid. # Unit: meter # # Format of an O-record: # ---------------------- # # Field 1:1 A1 -- Record ID. Should be letter O. # field 2:3 a2 delimiter: blanks. # Field 4:8 I5 -- Scan number # field 9:12 a4 delimiter: blanks. # Field 13:20 A8 -- Source name # field 21:25 a5 delimiter: blanks. # Field 26:46 A21 -- Calendar date in TAI in YYYY.MM.DD-hh:mm:ss.s format # Calendar date format: # field 26:29 -- I4 Year # field 30:30 -- a1 delimiter: . # field 31:32 -- I2 Month # field 33:33 -- a1 delimiter: . # field 34:35 -- I2 Day # field 36:36 -- a1 delimiter: - # field 37:38 -- I2 Hour # field 39:39 -- a1 delimiter: : # field 40:41 -- I2 Minute # field 42:42 -- a1 delimiter: : # field 43:46 -- F4.1 Seconds # field 47:48 a2 delimiter: blanks. # Field 49:56 A8 -- Site identifier # field 57:58 a2 delimiter: blanks. # Field 59:67 F9.5 -- Azimuth # Unit: degree # field 68:68 a1 delimiter: blank. # Field 69:76 F8.5 -- Elevation angle (outgoing) # Unit: degree # field 77:78 a2 delimiter: blanks. # Field 79:84 F6.1 -- Atmospheric surface pressure # Unit: hPa (mbar) # field 85:85 a1 delimiter: blank. # Field 86:90 F5.1 -- Surface air temperature # Unit: degree Celsius # field 91:92 a2 delimiter: blanks. # Field 93:107 1PD15.7 -- Slant total delay # Unit: seconds of time # field 108:108 a1 delimiter: blank. # Field 109:123 1PD15.7 -- Wet mapping factor # Tilting of the wet part of the atmosphere in the form # of a wet mapping function: # [wet_delay_along_the_path / wet_zenith_delay] # field 124:124 a1 delimiter: blank. # Field 125:139 1PD15.7 -- Hydrostatic zenith delay # Unit: seconds of time # field 140:140 a1 delimiter: blank. # Field 141:155 1PD15.7 -- Wet zenith delay # Unit: seconds of time # ####################################################################################################### # E $250331-z25090# H $250331-z25090# # M Ray-tracing results from RADIATE program (version: 2.0_Fortran, subversion: global_limit, created: 2025-06-25 15:37:58.241) developed by Armin Hofmeister, Technische Universität Wien. # U NONE # # Site| X-coordinate| Y-coordinate| Z-coordinate| Latitude| Longit.| Height S HART15M 5085490.8654 2668165.0378 -2768689.0981 -25.8897 27.6843 1409.41 S HOBART12 -3949987.2476 2522422.9059 -4311710.2915 -42.8056 147.4381 40.98 S YARRA12M -2388892.3900 5043348.3063 -3078596.1396 -29.0472 115.3456 248.06 # # # Scan| Source| Time tag in TAI| Site| Azimuth| Elev.| Pres.|Temp.| Slant total del|Wet map. factor|Hydr zenith del|Wet zenith del. O 1 0119+115 2025.03.31-06:30:15.0 HART15M 68.37373 15.00021 867.9 19.4 2.7392401E-08 3.8471732E+00 6.6131936E-09 5.8698406E-10 O 1 0119+115 2025.03.31-06:30:15.0 HOBART12 305.13553 16.84147 1019.5 14.2 2.7572329E-08 3.4292809E+00 7.7594942E-09 3.3016179E-10 O 1 0119+115 2025.03.31-06:30:15.0 YARRA12M 330.63881 44.23165 976.8 36.2 1.1266259E-08 1.4370698E+00 7.4370094E-09 4.3042205E-10 O 2 1057-797 2025.03.31-06:32:07.0 HART15M 185.14435 17.33536 867.9 19.4 2.3889263E-08 3.3490422E+00 6.6131936E-09 5.8698406E-10 O 2 1057-797 2025.03.31-06:32:07.0 HOBART12 166.77157 41.96156 1019.4 14.2 1.2082372E-08 1.4990376E+00 7.7594942E-09 3.3016179E-10 O 2 1057-797 2025.03.31-06:32:07.0 YARRA12M 171.00164 23.48044 976.7 35.6 1.9608184E-08 2.4801231E+00 7.4370094E-09 4.3042205E-10 O 3 0308-611 2025.03.31-06:33:35.0 HART15M 148.58293 21.17873 867.9 19.4 1.9784034E-08 2.7697878E+00 6.6131936E-09 5.8698406E-10 O 3 0308-611 2025.03.31-06:33:35.0 HOBART12 212.60484 65.70078 1019.3 14.2 8.8746353E-09 1.0987992E+00 7.7594942E-09 3.3016179E-10 O 3 0308-611 2025.03.31-06:33:35.0 YARRA12M 175.42775 57.98862 976.6 35.5 9.2722520E-09 1.1760440E+00 7.4370094E-09 4.3042205E-10 O 4 0003-066 2025.03.31-06:36:00.0 HART15M 74.30985 41.71546 867.8 19.5 1.0805424E-08 1.5035385E+00 6.6131936E-09 5.8698406E-10 O 4 0003-066 2025.03.31-06:36:00.0 HOBART12 276.72825 16.36197 1019.3 14.2 2.8344129E-08 3.5449841E+00 7.7594942E-09 3.3016179E-10 O 4 0003-066 2025.03.31-06:36:00.0 YARRA12M 292.11938 44.83981 976.6 36.3 1.1144099E-08 1.4176220E+00 7.4370094E-09 4.3042205E-10 O 5 2255-282 2025.03.31-06:38:03.0 HART15M 100.86268 64.31689 867.9 19.6 7.9877882E-09 1.1103099E+00 6.6131936E-09 5.8698406E-10 O 5 2255-282 2025.03.31-06:38:03.0 HOBART12 248.24083 17.83086 1019.3 14.1 2.6136904E-08 3.2762406E+00 7.7594942E-09 3.3016179E-10 O 5 2255-282 2025.03.31-06:38:03.0 YARRA12M 256.16792 38.76776 976.7 36.0 1.2538651E-08 1.5907482E+00 7.4370094E-09 4.3042205E-10 O 6 0035-252 2025.03.31-06:39:39.0 HART15M 101.00681 42.10371 867.9 19.6 1.0725032E-08 1.4930743E+00 6.6131936E-09 5.8698406E-10 O 6 0035-252 2025.03.31-06:39:39.0 HOBART12 265.79025 33.52516 1019.3 14.1 1.4610959E-08 1.8135624E+00 7.7594942E-09 3.3016179E-10 O 6 0035-252 2025.03.31-06:39:39.0 YARRA12M 269.62913 59.25804 976.6 35.9 9.1493528E-09 1.1621798E+00 7.4370094E-09 4.3042205E-10 O 7 0332-403 2025.03.31-06:41:30.0 HART15M 129.14959 11.48929 867.9 19.6 3.5226656E-08 5.0093355E+00 6.6131936E-09 5.8698406E-10 O 7 0332-403 2025.03.31-06:41:30.0 HOBART12 271.31171 72.64669 1019.3 14.1 8.4748194E-09 1.0481442E+00 7.7594942E-09 3.3016179E-10 O 7 0332-403 2025.03.31-06:41:30.0 YARRA12M 148.09042 76.66761 976.6 36.4 8.0844145E-09 1.0269888E+00 7.4370094E-09 4.3042205E-10 O 8 0405-385 2025.03.31-06:42:37.0 HART15M 130.41334 5.26348 867.9 19.8 7.0566075E-08 1.0674054E+01 6.6131936E-09 5.8698406E-10 O 8 0405-385 2025.03.31-06:42:37.0 HOBART12 286.19583 77.78440 1019.3 14.2 8.2767804E-09 1.0232993E+00 7.7594942E-09 3.3016179E-10 O 8 0405-385 2025.03.31-06:42:37.0 YARRA12M 127.85873 73.05398 976.6 36.2 8.2233417E-09 1.0449030E+00 7.4370094E-09 4.3042205E-10 O 9 0104-408 2025.03.31-06:44:20.0 HART15M 122.30983 39.25260 867.9 19.8 1.1361364E-08 1.5825062E+00 6.6131936E-09 5.8698406E-10 O 9 0104-408 2025.03.31-06:44:20.0 HOBART12 251.55642 45.73816 1019.4 14.2 1.1285161E-08 1.3990683E+00 7.7594942E-09 3.3016179E-10 O 9 0104-408 2025.03.31-06:44:20.0 YARRA12M 236.21493 64.21923 976.6 35.9 8.7336655E-09 1.1084425E+00 7.4370094E-09 4.3042205E-10 O 10 0402-362 2025.03.31-06:46:03.0 HART15M 127.71166 5.26378 867.9 19.8 7.0566137E-08 1.0675642E+01 6.6131936E-09 5.8698406E-10 O 10 0402-362 2025.03.31-06:46:03.0 HOBART12 292.32837 75.49405 1019.4 14.3 8.3555397E-09 1.0329856E+00 7.7594942E-09 3.3016179E-10 O 10 0402-362 2025.03.31-06:46:03.0 YARRA12M 122.17801 75.25509 976.7 35.8 8.1344807E-09 1.0337606E+00 7.4370094E-09 4.3042205E-10 O 11 0048-427 2025.03.31-06:48:23.0 HART15M 124.77621 42.93954 868.0 19.9 1.0556713E-08 1.4697548E+00 6.6131936E-09 5.8698406E-10 O 11 0048-427 2025.03.31-06:48:23.0 HOBART12 247.07556 43.12747 1019.4 14.1 1.1819839E-08 1.4661227E+00 7.7594942E-09 3.3016179E-10 O 11 0048-427 2025.03.31-06:48:23.0 YARRA12M 234.60726 60.15914 976.6 34.9 9.0652102E-09 1.1501961E+00 7.4370094E-09 4.3042205E-10 O 12 0119+115 2025.03.31-06:50:34.0 HART15M 65.59705 19.21755 868.1 19.8 2.1673553E-08 3.0315352E+00 6.6131936E-09 5.8698406E-10 O 12 0119+115 2025.03.31-06:50:34.0 HOBART12 301.11564 13.71226 1019.4 14.0 3.3481742E-08 4.1828465E+00 7.7594942E-09 3.3016179E-10 O 12 0119+115 2025.03.31-06:50:34.0 YARRA12M 324.65047 41.84703 976.6 34.7 1.1777095E-08 1.5021890E+00 7.4370094E-09 4.3042205E-10 O 13 0437-454 2025.03.31-06:52:26.0 HART15M 138.51484 5.25895 868.0 19.8 7.0602549E-08 1.0671179E+01 6.6131936E-09 5.8698406E-10 O 13 0437-454 2025.03.31-06:52:26.0 HOBART12 246.48201 82.72164 1019.3 13.9 8.1554118E-09 1.0084635E+00 7.7594942E-09 3.3016179E-10 O 13 0437-454 2025.03.31-06:52:26.0 YARRA12M 138.62437 65.89272 976.5 34.2 8.6164679E-09 1.0943770E+00 7.4370094E-09 4.3042205E-10 O 14 0308-611 2025.03.31-06:53:40.0 HART15M 147.96983 23.56130 868.0 19.8 1.7908749E-08 2.5039684E+00 6.6131936E-09 5.8698406E-10 O 14 0308-611 2025.03.31-06:53:40.0 HOBART12 215.64508 63.62514 1019.4 13.8 9.0278319E-09 1.1179470E+00 7.7594942E-09 3.3016179E-10 O 14 0308-611 2025.03.31-06:53:40.0 YARRA12M 180.04836 58.16273 976.5 34.5 9.2547417E-09 1.1737425E+00 7.4370094E-09 4.3042205E-10 O 15 1057-797 2025.03.31-06:55:04.0 HART15M 184.22089 16.91252 868.1 19.8 2.4454037E-08 3.4303845E+00 6.6131936E-09 5.8698406E-10 O 15 1057-797 2025.03.31-06:55:04.0 HOBART12 166.61911 42.93366 1019.4 13.8 1.1861406E-08 1.4713920E+00 7.7594942E-09 3.3016179E-10 O 15 1057-797 2025.03.31-06:55:04.0 YARRA12M 170.40599 24.29348 976.5 34.8 1.8999124E-08 2.4033355E+00 7.4370094E-09 4.3042205E-10 O 16 0346-279 2025.03.31-06:56:48.0 HART15M 117.79515 6.39732 868.1 19.8 5.9879335E-08 8.8669925E+00 6.6131936E-09 5.8698406E-10 O 16 0346-279 2025.03.31-06:56:48.0 HOBART12 301.31455 65.98886 1019.3 13.7 8.8540957E-09 1.0945290E+00 7.7594942E-09 3.3016179E-10 O 16 0346-279 2025.03.31-06:56:48.0 YARRA12M 82.78277 82.01039 976.5 35.0 7.9444843E-09 1.0100885E+00 7.4370094E-09 4.3042205E-10 O 17 2255-282 2025.03.31-06:58:47.0 HART15M 100.60710 68.91143 868.1 19.8 7.7160235E-09 1.0723310E+00 6.6131936E-09 5.8698406E-10 O 17 2255-282 2025.03.31-06:58:47.0 HOBART12 245.14275 14.32915 1019.3 13.6 3.2137222E-08 4.0521508E+00 7.7594942E-09 3.3016179E-10 O 17 2255-282 2025.03.31-06:58:47.0 YARRA12M 254.49695 34.37214 976.5 34.4 1.3896341E-08 1.7625565E+00 7.4370094E-09 4.3042205E-10 O 18 0003-066 2025.03.31-07:00:59.0 HART15M 69.87541 47.07735 868.1 19.8 9.8233718E-09 1.3661774E+00 6.6131936E-09 5.8698406E-10 O 18 0003-066 2025.03.31-07:00:59.0 HOBART12 272.37875 11.78262 1019.3 13.5 3.8624147E-08 4.8777592E+00 7.7594942E-09 3.3016179E-10 O 18 0003-066 2025.03.31-07:00:59.0 YARRA12M 287.39322 39.68650 976.4 34.5 1.2298481E-08 1.5643207E+00 7.4370094E-09 4.3042205E-10 O 19 0530-727 2025.03.31-07:03:47.0 HART15M 164.40561 16.54279 868.2 19.7 2.4974466E-08 3.5108848E+00 6.6131936E-09 5.8698406E-10 O 19 0530-727 2025.03.31-07:03:47.0 HOBART12 180.03022 60.06376 1019.3 13.4 9.3322141E-09 1.1558093E+00 7.7594942E-09 3.3016179E-10 O 19 0530-727 2025.03.31-07:03:47.0 YARRA12M 167.54719 43.11943 976.4 34.6 1.1491026E-08 1.4561654E+00 7.4370094E-09 4.3042205E-10 O 20 0104-408 2025.03.31-07:06:20.0 HART15M 122.23316 43.44902 868.2 19.6 1.0457662E-08 1.4558777E+00 6.6131936E-09 5.8698406E-10 O 20 0104-408 2025.03.31-07:06:20.0 HOBART12 249.11488 41.92819 1019.4 13.5 1.2091325E-08 1.4999438E+00 7.7594942E-09 3.3016179E-10 O 20 0104-408 2025.03.31-07:06:20.0 YARRA12M 238.47147 60.15594 976.5 34.7 9.0655676E-09 1.1503523E+00 7.4370094E-09 4.3042205E-10 O 21 0402-362 2025.03.31-07:08:03.0 HART15M 125.67961 9.24266 868.2 19.7 4.3106556E-08 6.1968780E+00 6.6131936E-09 5.8698406E-10 O 21 0402-362 2025.03.31-07:08:03.0 HOBART12 284.26860 71.65026 1019.4 13.4 8.5222129E-09 1.0538014E+00 7.7594942E-09 3.3016179E-10 O 21 0402-362 2025.03.31-07:08:03.0 YARRA12M 132.36960 79.11649 976.5 35.7 8.0109745E-09 1.0179624E+00 7.4370094E-09 4.3042205E-10 O 22 0405-385 2025.03.31-07:09:01.0 HART15M 128.02172 9.87743 868.3 19.6 4.0548163E-08 5.8079273E+00 6.6131936E-09 5.8698406E-10 O 22 0405-385 2025.03.31-07:09:01.0 HOBART12 277.81437 73.03353 1019.4 13.3 8.4571605E-09 1.0458373E+00 7.7594942E-09 3.3016179E-10 O 22 0405-385 2025.03.31-07:09:01.0 YARRA12M 139.82222 77.26501 976.4 35.5 8.0650533E-09 1.0246737E+00 7.4370094E-09 4.3042205E-10 O 23 0332-403 2025.03.31-07:10:09.0 HART15M 127.00721 16.57699 868.3 19.9 2.4927791E-08 3.5057529E+00 6.6131936E-09 5.8698406E-10 O 23 0332-403 2025.03.31-07:10:09.0 HOBART12 266.68171 67.37982 1019.4 13.3 8.7625648E-09 1.0840526E+00 7.7594942E-09 3.3016179E-10 O 23 0332-403 2025.03.31-07:10:09.0 YARRA12M 172.12087 78.86891 976.4 35.6 8.0174716E-09 1.0183479E+00 7.4370094E-09 4.3042205E-10 O 24 0437-454 2025.03.31-07:11:21.0 HART15M 136.81366 8.13268 868.3 20.0 4.8430249E-08 7.0272374E+00 6.6131936E-09 5.8698406E-10 O 24 0437-454 2025.03.31-07:11:21.0 HOBART12 251.26915 79.46868 1019.4 13.2 8.2282056E-09 1.0175919E+00 7.7594942E-09 3.3016179E-10 O 24 0437-454 2025.03.31-07:11:21.0 YARRA12M 144.02565 68.48972 976.4 35.8 8.4542056E-09 1.0737039E+00 7.4370094E-09 4.3042205E-10 O 25 0308-611 2025.03.31-07:12:34.0 HART15M 147.55902 25.83573 868.3 19.9 1.6444928E-08 2.2971170E+00 6.6131936E-09 5.8698406E-10 O 25 0308-611 2025.03.31-07:12:34.0 HOBART12 217.79915 61.54427 1019.5 13.2 9.1990986E-09 1.1393482E+00 7.7594942E-09 3.3016179E-10 O 25 0308-611 2025.03.31-07:12:34.0 YARRA12M 184.39792 58.00173 976.4 35.5 9.2708601E-09 1.1756995E+00 7.4370094E-09 4.3042205E-10 O 26 1057-797 2025.03.31-07:13:57.0 HART15M 183.43402 16.62810 868.4 20.1 2.4849798E-08 3.4875365E+00 6.6131936E-09 5.8698406E-10 O 26 1057-797 2025.03.31-07:13:57.0 HOBART12 166.59021 43.73869 1019.5 13.2 1.1686927E-08 1.4495736E+00 7.7594942E-09 3.3016179E-10 O 26 1057-797 2025.03.31-07:13:57.0 YARRA12M 169.97834 24.99877 976.4 35.8 1.8503319E-08 2.3408173E+00 7.4370094E-09 4.3042205E-10 O 27 0235+164 2025.03.31-07:15:49.0 HART15M 68.09405 6.04695 868.4 20.0 6.2758658E-08 9.2196641E+00 6.6131936E-09 5.8698406E-10 O 27 0235+164 2025.03.31-07:15:49.0 HOBART12 314.49203 17.37524 1019.5 13.2 2.6768491E-08 3.3224457E+00 7.7594942E-09 3.3016179E-10 O 27 0235+164 2025.03.31-07:15:49.0 YARRA12M 342.73324 42.48142 976.5 35.3 1.1635456E-08 1.4855841E+00 7.4370094E-09 4.3042205E-10 O 28 0229+131 2025.03.31-07:17:04.0 HART15M 69.95311 9.35352 868.4 19.8 4.2611520E-08 6.0778105E+00 6.6131936E-09 5.8698406E-10 O 28 0229+131 2025.03.31-07:17:04.0 HOBART12 310.87229 18.95604 1019.5 13.2 2.4658157E-08 3.0594680E+00 7.7594942E-09 3.3016179E-10 O 28 0229+131 2025.03.31-07:17:04.0 YARRA12M 338.79706 44.98002 976.5 35.1 1.1119007E-08 1.4187581E+00 7.4370094E-09 4.3042205E-10 O 29 0119+115 2025.03.31-07:18:30.0 HART15M 61.39750 24.85593 868.4 19.9 1.7039537E-08 2.3766139E+00 6.6131936E-09 5.8698406E-10 O 29 0119+115 2025.03.31-07:18:30.0 HOBART12 295.85748 9.19738 1019.4 13.1 4.8562028E-08 6.1554887E+00 7.7594942E-09 3.3016179E-10 O 29 0119+115 2025.03.31-07:18:30.0 YARRA12M 317.26545 37.98706 976.5 35.1 1.2759416E-08 1.6275566E+00 7.4370094E-09 4.3042205E-10 O 30 0003-066 2025.03.31-07:20:01.0 HART15M 65.92825 51.05508 868.4 20.0 9.2511178E-09 1.2861920E+00 6.6131936E-09 5.8698406E-10 O 30 0003-066 2025.03.31-07:20:01.0 HOBART12 269.12740 8.28282 1019.4 13.1 5.3432215E-08 6.8769992E+00 7.7594942E-09 3.3016179E-10 O 30 0003-066 2025.03.31-07:20:01.0 YARRA12M 284.19829 35.67281 976.5 35.2 1.3459289E-08 1.7119092E+00 7.4370094E-09 4.3042205E-10 O 31 0035-252 2025.03.31-07:22:38.0 HART15M 98.00406 51.66339 868.4 20.2 9.1735841E-09 1.2759863E+00 6.6131936E-09 5.8698406E-10 O 31 0035-252 2025.03.31-07:22:38.0 HOBART12 259.04985 25.69385 1019.4 13.1 1.8569891E-08 2.3118233E+00 7.7594942E-09 3.3016179E-10 O 31 0035-252 2025.03.31-07:22:38.0 YARRA12M 265.00609 49.85151 976.5 35.4 1.0282835E-08 1.3056513E+00 7.4370094E-09 4.3042205E-10 O 32 2255-282 2025.03.31-07:26:00.0 HART15M 101.18392 74.94123 868.5 20.6 7.4558246E-09 1.0359497E+00 6.6131936E-09 5.8698406E-10 O 32 2255-282 2025.03.31-07:26:00.0 HOBART12 240.98980 9.86707 1019.5 13.2 4.5558686E-08 5.8345438E+00 7.7594942E-09 3.3016179E-10 O 32 2255-282 2025.03.31-07:26:00.0 YARRA12M 252.22918 28.65734 976.5 35.4 1.6334344E-08 2.0711552E+00 7.4370094E-09 4.3042205E-10 O 33 0405-385 2025.03.31-07:29:13.0 HART15M 126.37975 13.50657 868.4 20.6 3.0255669E-08 4.2767918E+00 6.6131936E-09 5.8698406E-10 O 33 0405-385 2025.03.31-07:29:13.0 HOBART12 273.31471 69.33628 1019.5 13.3 8.6448485E-09 1.0692620E+00 7.7594942E-09 3.3016179E-10 O 33 0405-385 2025.03.31-07:29:13.0 YARRA12M 155.79809 79.65485 976.5 35.3 7.9967896E-09 1.0159051E+00 7.4370094E-09 4.3042205E-10 TROPO_PATH_DELAY Exchange format v 1.2_TUVienna Format version of 2014.07.10