TROPO_PATH_DELAY Exchange format v 1.2_TUVienna Format version of 2014.07.10 # # This file contains tropospheric slant and zenith path delays and wet mapping factor. # # Created by: Armin Hofmeister, Technische Universität Wien # # Created with RADIATE program developed by Armin Hofmeister # Version: 2.0_Fortran # Subversion: global_limit # # File created on: # 2019-03-02 | 07:09:46.291 # # Data content: # Ray-tracing results for session: # 91SEP09XS##### # Total number of observations: # 276 # Total number of different observing stations: # 2 # # Chosen ray-tracing options: # Assignment of observations to the epochs of the numerical weather model: # one_epoch_per_obs # Method of vertical interpolation (horizontal treatment): # profilewise # Method of numerical weather model usage: # Full grid information used. # Ray-tracing approach: # pwl # Station coordinate catalogue-file: # vlbi.ell # # Numerical weather model used: # Epoch 1: 1991090918 | Grib-file resolution: res_lat= 1.000 deg, res_lon= 1.000 deg # Epoch 2: 1991091000 | Grib-file resolution: res_lat= 1.000 deg, res_lon= 1.000 deg # Epoch 3: 1991091006 | Grib-file resolution: res_lat= 1.000 deg, res_lon= 1.000 deg # Epoch 4: 1991091012 | Grib-file resolution: res_lat= 1.000 deg, res_lon= 1.000 deg # # Origin and use of the observational data: # Observational data (scan number, source, observation time, site, azimuth, elevation) # as well as pressure- and temperature-values provided in this file originate from the # AzEl-file created by VieVS. # The reported pressure- and temperature-values have not been used for the ray-tracing. # Ray-tracing used temperature- and pressure-values only from the numerical weather # model and the standard atmosphere model. # # # --------------------------------------------------------------------------------------- # ----------------------------------- File description ---------------------------------- # --------------------------------------------------------------------------------------- # # 1) Header record -- the first record line should have a signature: # TROPO_PATH_DELAY Exchange format v N.N_additional Format version of YYYY.MM.DD # stating the version and date of the format # # The header record allows to distinguish a valid file in the TROPO_PATH_DELAY # format from files in other formats. # # 2) E-records section # E-record has letter E in the first field. # It specifies the experiment name. # # 3) H-records section # H-record has letter H in the first field. # It specifies the secondary experiment name. # # 4) M-records section # M-record has letter M in the first field. # The M record keeps the model identifier. # # 5) U-records section # U-record has letter U in the first field. # The U record instructs analysis software how to use the data. # Analysis software may override this recommendation. # # 6) S-records section # S-record has letter S in the first field. # It defines the name and coordinates of each site. A site cannot be # defined more than once. # # 7) O-records section # O-record has letter O in the first field. # It defines the circumstances of the observation: # the time tag, site ID, azimuth and elevation in the local # topocentric coordinate system, surface atmospheric pressure and # surface air temperature, slant and zenith path delay and # wet mapping factor. # # Records, which start from # character, are considered as comments. # # Format of an S-record: # ---------------------- # # Field 1:1 A1 -- Record ID. Should be letter S. # field 2:3 a2 delimiter: blanks. # Field 4:11 A8 -- 8-letter long site identifier. # May contain any characters with decimal codes 32-255, but # blanks are allowed only at the end of the site identifier. # This site identifier should be unique among S-records. # This field should not necessarily have a special meaning. # field 12:13 a2 delimiter: blanks. # Field 14:26 F13.4 -- X site coordinate in a crust fixed reference frame. # Unit: meter # field 27:27 a1 delimiter: blank. # Field 28:40 F13.4 -- Y site coordinate in a crust fixed reference frame. # Unit: meter # field 41:41 a1 delimiter: blank. # Field 42:54 F13.4 -- Z site coordinate in a crust fixed reference frame. # Unit: meter # field 55:56 a2 delimiter: blanks. # Field 57:64 F8.4 -- Geodetic latitude of site, # interval: [-90; 90], positive to north. # Unit: degree # field 65:65 a1 delimiter: blank. # Field 66:73 F8.4 -- Geodetic longitude of site, # interval: [0; 360[, increasing towards east. # Unit: degree # field 74:74 a1 delimiter: blank. # Field 75:81 F7.2 -- Height of site above the reference ellipsoid. # Unit: meter # # Format of an O-record: # ---------------------- # # Field 1:1 A1 -- Record ID. Should be letter O. # field 2:3 a2 delimiter: blanks. # Field 4:8 I5 -- Scan number # field 9:12 a4 delimiter: blanks. # Field 13:20 A8 -- Source name # field 21:25 a5 delimiter: blanks. # Field 26:46 A21 -- Calendar date in TAI in YYYY.MM.DD-hh:mm:ss.s format # Calendar date format: # field 26:29 -- I4 Year # field 30:30 -- a1 delimiter: . # field 31:32 -- I2 Month # field 33:33 -- a1 delimiter: . # field 34:35 -- I2 Day # field 36:36 -- a1 delimiter: - # field 37:38 -- I2 Hour # field 39:39 -- a1 delimiter: : # field 40:41 -- I2 Minute # field 42:42 -- a1 delimiter: : # field 43:46 -- F4.1 Seconds # field 47:48 a2 delimiter: blanks. # Field 49:56 A8 -- Site identifier # field 57:58 a2 delimiter: blanks. # Field 59:67 F9.5 -- Azimuth # Unit: degree # field 68:68 a1 delimiter: blank. # Field 69:76 F8.5 -- Elevation angle (outgoing) # Unit: degree # field 77:78 a2 delimiter: blanks. # Field 79:84 F6.1 -- Atmospheric surface pressure # Unit: hPa (mbar) # field 85:85 a1 delimiter: blank. # Field 86:90 F5.1 -- Surface air temperature # Unit: degree Celsius # field 91:92 a2 delimiter: blanks. # Field 93:107 1PD15.7 -- Slant total delay # Unit: seconds of time # field 108:108 a1 delimiter: blank. # Field 109:123 1PD15.7 -- Wet mapping factor # Tilting of the wet part of the atmosphere in the form # of a wet mapping function: # [wet_delay_along_the_path / wet_zenith_delay] # field 124:124 a1 delimiter: blank. # Field 125:139 1PD15.7 -- Hydrostatic zenith delay # Unit: seconds of time # field 140:140 a1 delimiter: blank. # Field 141:155 1PD15.7 -- Wet zenith delay # Unit: seconds of time # ####################################################################################################### # E $91SEP09XS##### H $91SEP09XS##### # M Ray-tracing results from RADIATE program (version: 2.0_Fortran, subversion: global_limit, created: 2019-03-02 07:09:46.291) developed by Armin Hofmeister, Technische Universität Wien. # U NONE # # Site| X-coordinate| Y-coordinate| Z-coordinate| Latitude| Longit.| Height S HARTRAO 5085440.3657 2668263.0528 -2768701.8135 -25.8898 27.6854 1415.70 S HOBART26 -3950235.0616 2522348.2197 -4311563.6733 -42.8036 147.4405 65.10 # # # Scan| Source| Time tag in TAI| Site| Azimuth| Elev.| Pres.|Temp.| Slant total del|Wet map. factor|Hydr zenith del|Wet zenith del. O 1 1610-771 1991.09.09-17:20:24.0 HARTRAO 188.31534 36.45584 880.2 15.6 1.1365540E-08 1.6763383E+00 6.5959912E-09 1.7367225E-10 O 1 1610-771 1991.09.09-17:20:24.0 HOBART26 187.04154 31.37192 1019.5 7.0 1.5281582E-08 1.9159162E+00 7.5898436E-09 3.9420271E-10 O 2 1815-553 1991.09.09-17:28:56.0 HARTRAO 183.92442 60.42142 880.3 15.4 7.7804503E-09 1.1483698E+00 6.5959912E-09 1.7367225E-10 O 2 1815-553 1991.09.09-17:28:56.0 HOBART26 210.27875 19.32653 1019.5 7.0 2.3880890E-08 3.0005660E+00 7.5898436E-09 3.9420271E-10 O 3 1921-293 1991.09.09-17:35:17.0 HARTRAO 111.13431 79.42508 880.4 15.3 6.8864179E-09 1.0177606E+00 6.5959912E-09 1.7367225E-10 O 3 1921-293 1991.09.09-17:35:17.0 HOBART26 236.58165 7.44863 1019.5 7.1 5.7868954E-08 7.4217984E+00 7.5898436E-09 3.9420271E-10 O 4 2128-123 1991.09.09-17:42:18.0 HARTRAO 78.47118 48.85503 880.5 15.1 8.9825987E-09 1.3318331E+00 6.5959912E-09 1.7367225E-10 O 4 2128-123 1991.09.09-17:42:18.0 HOBART26 268.68637 16.62372 1019.5 7.1 2.7544726E-08 3.4680951E+00 7.5898436E-09 3.9420271E-10 O 5 2326-477 1991.09.09-17:51:05.0 HARTRAO 131.50689 33.01429 880.6 15.0 1.2389733E-08 1.8373018E+00 6.5959912E-09 1.7367225E-10 O 5 2326-477 1991.09.09-17:51:05.0 HOBART26 244.21400 54.21355 1019.5 7.1 9.8350467E-09 1.2317420E+00 7.5898436E-09 3.9420271E-10 O 6 1610-771 1991.09.09-18:06:04.0 HARTRAO 190.60016 34.75612 880.8 14.8 1.1842705E-08 1.7463973E+00 6.5959912E-09 1.7367225E-10 O 6 1610-771 1991.09.09-18:06:04.0 HOBART26 184.26927 30.54260 1019.6 7.1 1.5651330E-08 1.9625343E+00 7.5898436E-09 3.9420271E-10 O 7 1815-553 1991.09.09-18:14:36.0 HARTRAO 196.23857 58.59357 880.9 14.7 7.9273907E-09 1.1695410E+00 6.5959912E-09 1.7367225E-10 O 7 1815-553 1991.09.09-18:14:36.0 HOBART26 204.81980 15.43853 1019.6 7.1 2.9516592E-08 3.7175679E+00 7.5898436E-09 3.9420271E-10 O 8 2255-282 1991.09.09-18:23:26.0 HARTRAO 105.03200 43.45120 881.0 14.4 9.8311046E-09 1.4577282E+00 6.5959912E-09 1.7367225E-10 O 8 2255-282 1991.09.09-18:23:26.0 HOBART26 262.16786 34.77602 1019.6 7.1 1.3962068E-08 1.7497672E+00 7.5898436E-09 3.9420271E-10 O 9 2326-477 1991.09.09-18:31:05.0 HARTRAO 131.53687 39.77779 881.2 14.1 1.0562429E-08 1.5645606E+00 6.5959912E-09 1.7367225E-10 O 9 2326-477 1991.09.09-18:31:05.0 HOBART26 241.52891 47.66371 1019.6 7.1 1.0788593E-08 1.3512632E+00 7.5898436E-09 3.9420271E-10 O 10 1610-771 1991.09.09-18:46:56.0 HARTRAO 192.18966 32.92930 881.5 13.9 1.2414813E-08 1.8305170E+00 6.5959912E-09 1.7367225E-10 O 10 1610-771 1991.09.09-18:46:56.0 HOBART26 181.69729 30.15081 1019.6 7.2 1.5833476E-08 1.9855505E+00 7.5898436E-09 3.9420271E-10 O 11 1815-553 1991.09.09-18:55:24.0 HARTRAO 205.05538 55.32176 881.6 13.8 8.2262931E-09 1.2131504E+00 6.5959912E-09 1.7367225E-10 O 11 1815-553 1991.09.09-18:55:24.0 HOBART26 199.59625 12.60016 1019.6 7.2 3.5739199E-08 4.5149649E+00 7.5898436E-09 3.9420271E-10 O 12 2326-477 1991.09.09-19:06:33.0 HARTRAO 132.61178 45.72370 881.8 13.6 9.4442678E-09 1.3979095E+00 6.5959912E-09 1.7367225E-10 O 12 2326-477 1991.09.09-19:06:33.0 HOBART26 238.71442 42.00644 1019.5 7.2 1.1910753E-08 1.4919905E+00 7.5898436E-09 3.9420271E-10 O 13 0208-512 1991.09.09-19:16:38.0 HARTRAO 137.58443 21.39484 881.9 13.6 1.8413998E-08 2.7397393E+00 6.5959912E-09 1.7367225E-10 O 13 0208-512 1991.09.09-19:16:38.0 HOBART26 238.04941 66.67066 1019.5 7.2 8.6923105E-09 1.0885744E+00 7.5898436E-09 3.9420271E-10 O 14 1610-771 1991.09.09-19:30:04.0 HARTRAO 193.36557 30.77064 882.0 13.5 1.3184200E-08 1.9437686E+00 6.5959912E-09 1.7367225E-10 O 14 1610-771 1991.09.09-19:30:04.0 HOBART26 178.94769 30.10608 1019.4 7.3 1.5854665E-08 1.9883137E+00 7.5898436E-09 3.9420271E-10 O 15 2255-282 1991.09.09-19:39:46.0 HARTRAO 101.71397 60.20753 882.0 13.4 7.7980000E-09 1.1541377E+00 6.5959912E-09 1.7367225E-10 O 15 2255-282 1991.09.09-19:39:46.0 HOBART26 250.84429 21.14827 1019.3 7.4 2.1950712E-08 2.7563359E+00 7.5898436E-09 3.9420271E-10 O 16 0208-512 1991.09.09-19:45:46.0 HARTRAO 136.49844 25.87507 882.1 13.4 1.5433347E-08 2.2918829E+00 6.5959912E-09 1.7367225E-10 O 16 0208-512 1991.09.09-19:45:46.0 HOBART26 238.92926 62.09705 1019.2 7.4 9.0305104E-09 1.1309314E+00 7.5898436E-09 3.9420271E-10 O 17 2326-477 1991.09.09-19:53:45.0 HARTRAO 136.19466 53.35902 882.1 13.4 8.4311691E-09 1.2470048E+00 6.5959912E-09 1.7367225E-10 O 17 2326-477 1991.09.09-19:53:45.0 HOBART26 234.45092 34.75821 1019.1 7.5 1.3966183E-08 1.7499790E+00 7.5898436E-09 3.9420271E-10 O 18 2255-282 1991.09.09-20:01:26.0 HARTRAO 101.21595 64.99680 882.1 13.4 7.4680538E-09 1.1048794E+00 6.5959912E-09 1.7367225E-10 O 18 2255-282 1991.09.09-20:01:26.0 HOBART26 247.64640 17.42228 1019.0 7.5 2.6342888E-08 3.3130331E+00 7.5898436E-09 3.9420271E-10 O 19 1815-553 1991.09.09-20:14:56.0 HARTRAO 215.44595 46.11097 882.2 13.3 9.3813861E-09 1.3823518E+00 6.5959912E-09 1.7367225E-10 O 19 1815-553 1991.09.09-20:14:56.0 HOBART26 188.69129 9.01485 1018.9 7.6 4.8724290E-08 6.1949821E+00 7.5898436E-09 3.9420271E-10 O 20 1610-771 1991.09.09-20:23:24.0 HARTRAO 194.09781 27.90201 882.2 13.3 1.4400492E-08 2.1230184E+00 6.5959912E-09 1.7367225E-10 O 20 1610-771 1991.09.09-20:23:24.0 HOBART26 175.58605 30.57507 1018.7 7.7 1.5636734E-08 1.9609872E+00 7.5898436E-09 3.9420271E-10 O 21 2255-282 1991.09.09-20:33:06.0 HARTRAO 101.28751 72.00376 882.2 13.3 7.1171979E-09 1.0524404E+00 6.5959912E-09 1.7367225E-10 O 21 2255-282 1991.09.09-20:33:06.0 HOBART26 242.89083 12.13331 1018.6 7.7 3.7045396E-08 4.6831033E+00 7.5898436E-09 3.9420271E-10 O 22 0308-611 1991.09.09-20:42:05.0 HARTRAO 147.56567 26.82739 882.2 13.3 1.4928933E-08 2.2132024E+00 6.5959912E-09 1.7367225E-10 O 22 0308-611 1991.09.09-20:42:05.0 HOBART26 218.31258 60.58230 1018.5 7.8 9.1612214E-09 1.1473082E+00 7.5898436E-09 3.9420271E-10 O 23 2255-282 1991.09.09-20:56:18.0 HARTRAO 102.68480 77.12461 882.2 13.2 6.9439625E-09 1.0264757E+00 6.5959912E-09 1.7367225E-10 O 23 2255-282 1991.09.09-20:56:18.0 HOBART26 239.31075 8.39797 1018.3 7.9 5.1994900E-08 6.6388937E+00 7.5898436E-09 3.9420271E-10 O 24 2326-477 1991.09.09-21:03:53.0 HARTRAO 149.00248 63.15340 882.2 13.1 7.5621395E-09 1.1191103E+00 6.6065794E-09 1.4287136E-10 O 24 2326-477 1991.09.09-21:03:53.0 HOBART26 227.12854 24.75665 1018.3 7.9 1.8910891E-08 2.3840866E+00 7.5682468E-09 3.9766370E-10 O 25 0208-512 1991.09.09-21:12:06.0 HARTRAO 136.06001 39.42633 882.2 12.8 1.0608098E-08 1.5704082E+00 6.6065794E-09 1.4287136E-10 O 25 0208-512 1991.09.09-21:12:06.0 HOBART26 236.47495 48.61035 1018.2 8.0 1.0606744E-08 1.3327533E+00 7.5682468E-09 3.9766370E-10 O 26 0308-611 1991.09.09-21:19:45.0 HARTRAO 147.43224 31.39946 882.2 12.7 1.2911498E-08 1.9088363E+00 6.6065794E-09 1.4287136E-10 O 26 0308-611 1991.09.09-21:19:45.0 HOBART26 220.58978 56.16664 1018.1 8.0 9.5835929E-09 1.2040641E+00 7.5682468E-09 3.9766370E-10 O 27 1815-553 1991.09.09-21:35:36.0 HARTRAO 219.04845 34.98641 882.2 12.3 1.1739977E-08 1.7291151E+00 6.6065794E-09 1.4287136E-10 O 27 1815-553 1991.09.09-21:35:36.0 HOBART26 177.13161 8.25875 1018.0 8.1 5.2656493E-08 6.8164731E+00 7.5682468E-09 3.9766370E-10 O 28 0208-512 1991.09.09-21:46:06.0 HARTRAO 137.37774 44.69153 882.2 12.0 9.5846610E-09 1.4187112E+00 6.6065794E-09 1.4287136E-10 O 28 0208-512 1991.09.09-21:46:06.0 HOBART26 234.36043 43.45975 1018.0 8.1 1.1563792E-08 1.4534916E+00 7.5682468E-09 3.9766370E-10 O 29 0420-014 1991.09.09-21:53:09.0 HARTRAO 87.40774 8.42050 882.2 11.9 4.3895454E-08 6.8131109E+00 6.6065794E-09 1.4287136E-10 O 29 0420-014 1991.09.09-21:53:09.0 HOBART26 309.60954 36.18945 1018.0 8.1 1.3462604E-08 1.6899172E+00 7.5682468E-09 3.9766370E-10 O 30 2326-477 1991.09.09-22:04:25.0 HARTRAO 171.00429 67.98899 882.2 11.7 7.2782748E-09 1.0766640E+00 6.6065794E-09 1.4287136E-10 O 30 2326-477 1991.09.09-22:04:25.0 HOBART26 219.87814 17.08732 1018.0 8.2 2.6765854E-08 3.3893503E+00 7.5682468E-09 3.9766370E-10 O 31 0454-234 1991.09.09-22:15:06.0 HARTRAO 109.17610 14.84147 882.2 11.5 2.5920871E-08 3.8915749E+00 6.6065794E-09 1.4287136E-10 O 31 0454-234 1991.09.09-22:15:06.0 HOBART26 292.06646 54.90555 1017.9 8.2 9.7301753E-09 1.2213132E+00 7.5682468E-09 3.9766370E-10 O 32 0308-611 1991.09.09-22:29:25.0 HARTRAO 149.38496 39.69054 882.2 11.3 1.0548959E-08 1.5595571E+00 6.6065794E-09 1.4287136E-10 O 32 0308-611 1991.09.09-22:29:25.0 HOBART26 221.11001 47.73138 1017.9 8.3 1.0752478E-08 1.3514743E+00 7.5682468E-09 3.9766370E-10 O 33 0420-014 1991.09.09-22:38:57.0 HARTRAO 82.15371 18.70365 882.2 11.2 2.0838621E-08 3.1345615E+00 6.6065794E-09 1.4287136E-10 O 33 0420-014 1991.09.09-22:38:57.0 HOBART26 298.75182 29.21976 1017.8 8.4 1.6257999E-08 2.0423761E+00 7.5682468E-09 3.9766370E-10 O 34 0537-441 1991.09.09-22:43:57.0 HARTRAO 130.46578 19.39079 882.2 11.1 2.0134481E-08 2.9915772E+00 6.6065794E-09 1.4287136E-10 O 34 0537-441 1991.09.09-22:43:57.0 HOBART26 255.70654 66.69328 1017.7 8.4 8.6713604E-09 1.0887407E+00 7.5682468E-09 3.9766370E-10 O 35 0420-014 1991.09.09-22:48:49.0 HARTRAO 80.95589 20.90467 882.1 11.0 1.8767967E-08 2.8172371E+00 6.6065794E-09 1.4287136E-10 O 35 0420-014 1991.09.09-22:48:49.0 HOBART26 296.61483 27.61279 1017.7 8.5 1.7113966E-08 2.1504763E+00 7.5682468E-09 3.9766370E-10 O 36 0530-727 1991.09.09-22:58:13.0 HARTRAO 160.76236 27.10285 882.1 10.9 1.4744194E-08 2.1755873E+00 6.6065794E-09 1.4287136E-10 O 36 0530-727 1991.09.09-22:58:13.0 HOBART26 198.63159 55.10070 1017.6 8.6 9.7057621E-09 1.2197331E+00 7.5682468E-09 3.9766370E-10 O 37 0208-512 1991.09.09-23:06:38.0 HARTRAO 145.90889 56.14021 882.1 10.9 8.1230989E-09 1.2019724E+00 6.6065794E-09 1.4287136E-10 O 37 0208-512 1991.09.09-23:06:38.0 HOBART26 227.78365 31.91675 1017.6 8.7 1.5017583E-08 1.8901820E+00 7.5682468E-09 3.9766370E-10 O 38 0537-441 1991.09.09-23:11:57.0 HARTRAO 129.01564 24.24833 882.1 10.9 1.6337166E-08 2.4241884E+00 6.6065794E-09 1.4287136E-10 O 38 0537-441 1991.09.09-23:11:57.0 HOBART26 253.74300 61.72507 1017.5 8.7 9.0414691E-09 1.1353222E+00 7.5682468E-09 3.9766370E-10 O 39 2326-477 1991.09.09-23:24:33.0 HARTRAO 204.88486 65.28755 882.0 11.1 7.4274734E-09 1.0979738E+00 6.6065794E-09 1.4287136E-10 O 39 2326-477 1991.09.09-23:24:33.0 HOBART26 208.95011 8.74381 1017.4 8.9 5.0009411E-08 6.4473461E+00 7.5682468E-09 3.9766370E-10 O 40 0454-234 1991.09.09-23:35:26.0 HARTRAO 102.47927 32.26823 882.0 11.1 1.2605166E-08 1.8752442E+00 6.6065794E-09 1.4287136E-10 O 40 0454-234 1991.09.09-23:35:26.0 HOBART26 274.55243 40.54975 1017.3 9.0 1.2232731E-08 1.5364319E+00 7.5682468E-09 3.9766370E-10 O 41 0637-752 1991.09.09-23:41:17.0 HARTRAO 163.62450 25.61727 882.0 11.1 1.5526270E-08 2.2898877E+00 6.6065794E-09 1.4287136E-10 O 41 0637-752 1991.09.09-23:41:17.0 HOBART26 193.56272 54.58346 1017.2 9.1 9.7674392E-09 1.2275619E+00 7.5682468E-09 3.9766370E-10 O 42 0420-014 1991.09.09-23:47:29.0 HARTRAO 72.95501 33.79131 881.9 11.2 1.2105218E-08 1.8063215E+00 6.6065794E-09 1.4287136E-10 O 42 0420-014 1991.09.09-23:47:29.0 HOBART26 284.99609 17.53431 1017.1 9.2 2.6135802E-08 3.2961449E+00 7.5682468E-09 3.9766370E-10 O 43 0308-611 1991.09.09-23:57:25.0 HARTRAO 157.13515 48.78617 881.9 11.3 8.9631928E-09 1.3249348E+00 6.6065794E-09 1.4287136E-10 O 43 0308-611 1991.09.09-23:57:25.0 HOBART26 217.58043 37.40673 1017.1 9.3 1.3083692E-08 1.6459942E+00 7.5682468E-09 3.9766370E-10 O 44 0537-441 1991.09.10-00:04:49.0 HARTRAO 127.29527 33.63843 881.9 11.3 1.2150804E-08 1.8011162E+00 6.6065794E-09 1.4287136E-10 O 44 0537-441 1991.09.10-00:04:49.0 HOBART26 249.46890 52.49785 1017.0 9.4 1.0033130E-08 1.2602059E+00 7.5682468E-09 3.9766370E-10 O 45 0420-014 1991.09.10-00:09:57.0 HARTRAO 69.29435 38.58585 881.9 11.3 1.0803085E-08 1.6102849E+00 6.6065794E-09 1.4287136E-10 O 45 0420-014 1991.09.10-00:09:57.0 HOBART26 280.91022 13.50795 1016.9 9.5 3.3436803E-08 4.2340339E+00 7.5682468E-09 3.9766370E-10 O 46 0530-727 1991.09.10-00:22:33.0 HARTRAO 162.02533 33.24088 881.8 11.1 1.2276482E-08 1.8119838E+00 6.6065794E-09 1.4287136E-10 O 46 0530-727 1991.09.10-00:22:33.0 HOBART26 203.07898 49.48780 1016.5 9.8 1.0467017E-08 1.3157670E+00 7.5682468E-09 3.9766370E-10 O 47 0208-512 1991.09.10-00:30:58.0 HARTRAO 167.55645 63.98736 881.8 11.0 7.5076604E-09 1.1103787E+00 6.6065794E-09 1.4287136E-10 O 47 0208-512 1991.09.10-00:30:58.0 HOBART26 218.99196 21.24278 1016.5 9.8 2.1806651E-08 2.7539156E+00 7.5682468E-09 3.9766370E-10 O 48 0727-115 1991.09.10-00:42:37.0 HARTRAO 98.67404 8.98479 881.8 10.8 4.1381585E-08 6.3617179E+00 6.6065794E-09 1.4287136E-10 O 48 0727-115 1991.09.10-00:42:37.0 HOBART26 306.17171 47.04276 1016.2 10.1 1.0873812E-08 1.3646859E+00 7.5682468E-09 3.9766370E-10 O 49 0454-234 1991.09.10-00:48:06.0 HARTRAO 96.81789 48.41784 881.8 10.6 9.0151816E-09 1.3387317E+00 6.6065794E-09 1.4287136E-10 O 49 0454-234 1991.09.10-00:48:06.0 HOBART26 262.36066 27.21551 1016.1 10.2 1.7337954E-08 2.1814061E+00 7.5682468E-09 3.9766370E-10 O 50 0308-611 1991.09.10-00:56:33.0 HARTRAO 166.32936 53.02086 881.8 10.4 8.4423789E-09 1.2476841E+00 6.6065794E-09 1.4287136E-10 O 50 0308-611 1991.09.10-00:56:33.0 HOBART26 213.51323 31.07063 1016.0 10.3 1.5380252E-08 1.9368893E+00 7.5682468E-09 3.9766370E-10 O 51 0537-441 1991.09.10-01:09:09.0 HARTRAO 127.49811 45.20343 881.8 10.1 9.4999306E-09 1.4073941E+00 6.6065794E-09 1.4287136E-10 O 51 0537-441 1991.09.10-01:09:09.0 HOBART26 243.55349 41.64579 1015.9 10.4 1.1967620E-08 1.5041339E+00 7.5682468E-09 3.9766370E-10 O 52 0530-727 1991.09.10-01:16:13.0 HARTRAO 164.27494 36.76844 881.8 9.8 1.1249741E-08 1.6605787E+00 6.6065794E-09 1.4287136E-10 O 52 0530-727 1991.09.10-01:16:13.0 HOBART26 203.82801 45.54054 1015.7 10.5 1.1145913E-08 1.4014816E+00 7.5682468E-09 3.9766370E-10 O 53 0208-512 1991.09.10-01:24:38.0 HARTRAO 187.04847 64.57311 881.8 9.6 7.4708085E-09 1.1044875E+00 6.6065794E-09 1.4287136E-10 O 53 0208-512 1991.09.10-01:24:38.0 HOBART26 212.49037 15.47235 1015.6 10.6 2.9396345E-08 3.7301915E+00 7.5682468E-09 3.9766370E-10 O 54 0637-752 1991.09.10-01:30:29.0 HARTRAO 164.84831 32.43795 881.8 9.3 1.2543575E-08 1.8507444E+00 6.6065794E-09 1.4287136E-10 O 54 0637-752 1991.09.10-01:30:29.0 HOBART26 199.44067 48.71513 1015.5 10.6 1.0589445E-08 1.3312746E+00 7.5682468E-09 3.9766370E-10 O 55 0727-115 1991.09.10-01:36:17.0 HARTRAO 93.11193 21.01919 881.8 9.1 1.8670710E-08 2.7957192E+00 6.6065794E-09 1.4287136E-10 O 55 0727-115 1991.09.10-01:36:17.0 HOBART26 292.52952 38.43671 1015.2 10.7 1.2790312E-08 1.6059548E+00 7.5682468E-09 3.9766370E-10 O 56 0308-611 1991.09.10-01:46:25.0 HARTRAO 176.17748 54.75112 881.8 8.7 8.2590100E-09 1.2202682E+00 6.6065794E-09 1.4287136E-10 O 56 0308-611 1991.09.10-01:46:25.0 HOBART26 209.28915 26.28556 1015.1 10.8 1.7894841E-08 2.2563756E+00 7.5682468E-09 3.9766370E-10 O 57 0537-441 1991.09.10-01:53:29.0 HARTRAO 129.87268 53.02889 881.8 8.4 8.4420419E-09 1.2503255E+00 6.6065794E-09 1.4287136E-10 O 57 0537-441 1991.09.10-01:53:29.0 HOBART26 239.05877 34.49302 1015.0 10.8 1.4028315E-08 1.7644638E+00 7.5682468E-09 3.9766370E-10 O 58 0454-234 1991.09.10-02:03:38.0 HARTRAO 90.06955 65.40886 881.8 7.9 7.4210537E-09 1.1009162E+00 6.6065794E-09 1.4287136E-10 O 58 0454-234 1991.09.10-02:03:38.0 HOBART26 250.64523 13.73103 1014.7 10.9 3.2911461E-08 4.1746898E+00 7.5682468E-09 3.9766370E-10 O 59 0530-727 1991.09.10-02:12:45.0 HARTRAO 167.88686 39.85714 881.8 7.7 1.0511910E-08 1.5516603E+00 6.6065794E-09 1.4287136E-10 O 59 0530-727 1991.09.10-02:12:45.0 HOBART26 203.22838 41.37207 1014.6 10.9 1.2031328E-08 1.5133688E+00 7.5682468E-09 3.9766370E-10 O 60 0637-752 1991.09.10-02:18:49.0 HARTRAO 166.63383 35.13453 881.8 7.5 1.1697605E-08 1.7260707E+00 6.6065794E-09 1.4287136E-10 O 60 0637-752 1991.09.10-02:18:49.0 HOBART26 200.24111 45.68572 1014.5 11.0 1.1118441E-08 1.3980724E+00 7.5682468E-09 3.9766370E-10 O 61 0208-512 1991.09.10-02:24:38.0 HARTRAO 205.80412 60.63640 881.8 7.4 7.7407803E-09 1.1437572E+00 6.6065794E-09 1.4287136E-10 O 61 0208-512 1991.09.10-02:24:38.0 HOBART26 204.45333 10.20494 1014.4 11.0 4.3411788E-08 5.5681901E+00 7.5682468E-09 3.9766370E-10 O 62 0454-234 1991.09.10-02:30:46.0 HARTRAO 86.65291 71.52495 881.9 7.2 7.1154373E-09 1.0552754E+00 6.6065794E-09 1.4287136E-10 O 62 0454-234 1991.09.10-02:30:46.0 HOBART26 246.38945 9.08811 1014.2 11.0 4.8307050E-08 6.2006753E+00 7.5682468E-09 3.9766370E-10 O 63 0537-441 1991.09.10-02:35:09.0 HARTRAO 134.90831 59.99873 881.9 7.2 7.7903497E-09 1.1535170E+00 6.6065794E-09 1.4287136E-10 O 63 0537-441 1991.09.10-02:35:09.0 HOBART26 234.50450 28.08149 1014.1 11.0 1.6847887E-08 2.1215839E+00 7.5682468E-09 3.9766370E-10 O 64 0727-115 1991.09.10-02:40:57.0 HARTRAO 85.92913 35.59327 881.9 7.0 1.1570719E-08 1.7234356E+00 6.6065794E-09 1.4287136E-10 O 64 0727-115 1991.09.10-02:40:57.0 HOBART26 279.37006 27.01353 1014.0 11.1 1.7458264E-08 2.1952318E+00 7.5682468E-09 3.9766370E-10 O 65 0208-512 1991.09.10-02:49:18.0 HARTRAO 211.34335 57.96742 881.9 7.0 7.9571149E-09 1.1753980E+00 6.6065794E-09 1.4287136E-10 O 65 0208-512 1991.09.10-02:49:18.0 HOBART26 200.93731 8.45410 1013.8 11.1 5.1554128E-08 6.6574972E+00 7.5682468E-09 3.9766370E-10 O 66 0308-611 1991.09.10-03:12:53.0 HARTRAO 193.72185 53.00564 881.9 7.0 8.4649466E-09 1.2476022E+00 6.6181293E-09 1.4800757E-10 O 66 0308-611 1991.09.10-03:12:53.0 HOBART26 200.58807 19.55372 1013.8 11.1 2.3424956E-08 2.9610800E+00 7.5242456E-09 3.9514543E-10 O 67 0537-441 1991.09.10-03:19:57.0 HARTRAO 145.48469 66.53394 882.0 7.0 7.3743190E-09 1.0889480E+00 6.6181293E-09 1.4800757E-10 O 67 0537-441 1991.09.10-03:19:57.0 HOBART26 229.21836 21.59992 1013.6 11.0 2.1338859E-08 2.6942112E+00 7.5242456E-09 3.9514543E-10 O 68 0637-752 1991.09.10-03:23:57.0 HARTRAO 170.22848 38.10705 882.0 7.0 1.0941031E-08 1.6115077E+00 6.6181293E-09 1.4800757E-10 O 68 0637-752 1991.09.10-03:23:57.0 HOBART26 199.86752 41.55287 1013.3 11.0 1.1917257E-08 1.5038312E+00 7.5242456E-09 3.9514543E-10 O 69 0727-115 1991.09.10-03:29:17.0 HARTRAO 79.41054 46.40181 882.1 7.0 9.3335249E-09 1.3834708E+00 6.6181293E-09 1.4800757E-10 O 69 0727-115 1991.09.10-03:29:17.0 HOBART26 270.79260 18.16627 1013.1 11.0 2.5121409E-08 3.1792901E+00 7.5242456E-09 3.9514543E-10 O 70 0530-727 1991.09.10-03:37:53.0 HARTRAO 175.35694 42.70809 882.2 7.0 9.9604625E-09 1.4673034E+00 6.6181293E-09 1.4800757E-10 O 70 0530-727 1991.09.10-03:37:53.0 HOBART26 200.24561 35.52777 1013.0 11.0 1.3591180E-08 1.7151621E+00 7.5242456E-09 3.9514543E-10 O 71 0537-441 1991.09.10-03:44:57.0 HARTRAO 154.84920 69.35590 882.3 7.0 7.2289753E-09 1.0673647E+00 6.6181293E-09 1.4800757E-10 O 71 0537-441 1991.09.10-03:44:57.0 HOBART26 226.07937 18.20159 1013.0 10.9 2.5062089E-08 3.1669103E+00 7.5242456E-09 3.9514543E-10 O 72 0637-752 1991.09.10-03:48:57.0 HARTRAO 171.93170 38.98250 882.4 7.1 1.0734476E-08 1.5810631E+00 6.6181293E-09 1.4800757E-10 O 72 0637-752 1991.09.10-03:48:57.0 HOBART26 199.34493 40.00876 1012.9 10.9 1.2293166E-08 1.5512937E+00 7.5242456E-09 3.9514543E-10 O 73 1034-293 1991.09.10-04:02:25.0 HARTRAO 114.44677 18.72429 882.5 7.2 2.0863415E-08 3.1015197E+00 6.6181293E-09 1.4800757E-10 O 73 1034-293 1991.09.10-04:02:25.0 HOBART26 281.45167 57.26207 1012.5 10.8 9.4099441E-09 1.1878165E+00 7.5242456E-09 3.9514543E-10 O 74 1057-797 1991.09.10-04:11:18.0 HARTRAO 168.89466 26.26676 882.6 7.4 1.5210934E-08 2.2385209E+00 6.6181293E-09 1.4800757E-10 O 74 1057-797 1991.09.10-04:11:18.0 HOBART26 188.88790 50.72887 1012.5 10.8 1.0219203E-08 1.2897885E+00 7.5242456E-09 3.9514543E-10 O 75 0308-611 1991.09.10-04:22:45.0 HARTRAO 204.21466 47.79337 882.7 7.5 9.1244119E-09 1.3441069E+00 6.6181293E-09 1.4800757E-10 O 75 0308-611 1991.09.10-04:22:45.0 HOBART26 192.58124 15.87623 1012.5 10.7 2.8511091E-08 3.6122118E+00 7.5242456E-09 3.9514543E-10 O 76 0637-752 1991.09.10-04:30:17.0 HARTRAO 175.05617 40.04308 882.9 7.7 1.0497608E-08 1.5460977E+00 6.6181293E-09 1.4800757E-10 O 76 0637-752 1991.09.10-04:30:17.0 HOBART26 198.08762 37.56457 1012.4 10.7 1.2959074E-08 1.6354093E+00 7.5242456E-09 3.9514543E-10 O 77 1057-797 1991.09.10-04:36:06.0 HARTRAO 168.95328 27.34225 883.0 7.9 1.4662593E-08 2.1579746E+00 6.6181293E-09 1.4800757E-10 O 77 1057-797 1991.09.10-04:36:06.0 HOBART26 190.09397 49.97569 1012.2 10.6 1.0330605E-08 1.3038223E+00 7.5242456E-09 3.9514543E-10 O 78 1104-445 1991.09.10-04:48:44.0 HARTRAO 129.35454 26.06336 883.2 8.3 1.5322567E-08 2.2658234E+00 6.6181293E-09 1.4800757E-10 O 78 1104-445 1991.09.10-04:48:44.0 HOBART26 251.66388 60.18550 1012.0 10.5 9.1229269E-09 1.1512903E+00 7.5242456E-09 3.9514543E-10 O 79 0537-441 1991.09.10-04:57:09.0 HARTRAO 193.57621 71.15460 883.3 8.8 7.1480971E-09 1.0550148E+00 6.6181293E-09 1.4800757E-10 O 79 0537-441 1991.09.10-04:57:09.0 HOBART26 216.19433 9.45842 1011.9 10.5 4.6256308E-08 5.9054352E+00 7.5242456E-09 3.9514543E-10 O 80 1057-797 1991.09.10-05:03:38.0 HARTRAO 169.17216 28.52182 883.4 9.1 1.4110137E-08 2.0768132E+00 6.6181293E-09 1.4800757E-10 O 80 1057-797 1991.09.10-05:03:38.0 HOBART26 191.23378 49.03707 1011.8 10.5 1.0475436E-08 1.3220752E+00 7.5242456E-09 3.9514543E-10 O 81 0537-441 1991.09.10-05:10:09.0 HARTRAO 200.18476 70.30102 883.5 9.7 7.1853082E-09 1.0604211E+00 6.6181293E-09 1.4800757E-10 O 81 0537-441 1991.09.10-05:10:09.0 HOBART26 214.28088 8.07884 1011.6 10.4 5.3357659E-08 6.8491615E+00 7.5242456E-09 3.9514543E-10 O 82 0530-727 1991.09.10-05:16:53.0 HARTRAO 185.29063 42.57824 883.7 10.4 9.9847661E-09 1.4704086E+00 6.6181293E-09 1.4800757E-10 O 82 0530-727 1991.09.10-05:16:53.0 HOBART26 194.50364 30.04219 1011.4 10.4 1.5755060E-08 1.9889587E+00 7.5242456E-09 3.9514543E-10 O 83 0637-752 1991.09.10-05:23:49.0 HARTRAO 179.46129 40.62466 883.7 10.9 1.0373536E-08 1.5276457E+00 6.6181293E-09 1.4800757E-10 O 83 0637-752 1991.09.10-05:23:49.0 HOBART26 195.83386 34.68370 1011.4 10.3 1.3876834E-08 1.7514282E+00 7.5242456E-09 3.9514543E-10 O 84 1057-797 1991.09.10-05:29:38.0 HARTRAO 169.52936 29.60660 883.7 11.7 1.3642294E-08 2.0080705E+00 6.6181293E-09 1.4800757E-10 O 84 1057-797 1991.09.10-05:29:38.0 HOBART26 192.10924 48.06833 1011.3 10.3 1.0632252E-08 1.3418457E+00 7.5242456E-09 3.9514543E-10 O 85 1034-293 1991.09.10-05:43:05.0 HARTRAO 107.94662 39.91098 883.9 13.1 1.0528020E-08 1.5583058E+00 6.6181293E-09 1.4800757E-10 O 85 1034-293 1991.09.10-05:43:05.0 HOBART26 263.29683 38.83187 1011.2 10.3 1.2604569E-08 1.5906553E+00 7.5242456E-09 3.9514543E-10 O 86 0637-752 1991.09.10-05:51:09.0 HARTRAO 181.75456 40.55910 883.9 13.9 1.0387289E-08 1.5295448E+00 6.6181293E-09 1.4800757E-10 O 86 0637-752 1991.09.10-05:51:09.0 HOBART26 194.45308 33.36944 1011.2 10.2 1.4352502E-08 1.8116074E+00 7.5242456E-09 3.9514543E-10 O 87 1057-797 1991.09.10-05:56:58.0 HARTRAO 170.06252 30.70003 884.0 14.4 1.3205550E-08 1.9438842E+00 6.6181293E-09 1.4800757E-10 O 87 1057-797 1991.09.10-05:56:58.0 HOBART26 192.81601 46.98189 1011.0 10.2 1.0817517E-08 1.3652101E+00 7.5242456E-09 3.9514543E-10 O 88 0637-752 1991.09.10-06:02:49.0 HARTRAO 182.72388 40.45625 884.0 15.0 1.0408998E-08 1.5326802E+00 6.6181293E-09 1.4800757E-10 O 88 0637-752 1991.09.10-06:02:49.0 HOBART26 193.82253 32.84526 1010.9 10.2 1.4553572E-08 1.8370572E+00 7.5242456E-09 3.9514543E-10 O 89 0308-611 1991.09.10-06:10:25.0 HARTRAO 211.86294 36.09606 884.1 15.9 1.1456939E-08 1.6857676E+00 6.6181293E-09 1.4800757E-10 O 89 0308-611 1991.09.10-06:10:25.0 HOBART26 179.30908 13.81169 1010.9 10.2 3.2518371E-08 4.1334980E+00 7.5242456E-09 3.9514543E-10 O 90 1104-445 1991.09.10-06:27:04.0 HARTRAO 128.21710 43.47058 884.2 17.0 9.8214104E-09 1.4510085E+00 6.6181293E-09 1.4800757E-10 O 90 1104-445 1991.09.10-06:27:04.0 HOBART26 243.58011 43.45322 1010.8 10.1 1.1496821E-08 1.4504753E+00 7.5242456E-09 3.9514543E-10 O 91 1057-797 1991.09.10-06:34:26.0 HARTRAO 171.05062 32.08988 884.2 17.6 1.2695395E-08 1.8688855E+00 6.6181293E-09 1.4800757E-10 O 91 1057-797 1991.09.10-06:34:26.0 HOBART26 193.43310 45.41325 1010.7 10.1 1.1103844E-08 1.4013318E+00 7.5242456E-09 3.9514543E-10 O 92 1334-127 1991.09.10-06:42:06.0 HARTRAO 100.52728 7.99611 884.3 18.2 4.6085270E-08 7.0759078E+00 6.6181293E-09 1.4800757E-10 O 92 1334-127 1991.09.10-06:42:06.0 HOBART26 307.03379 49.04401 1010.7 10.1 1.0477599E-08 1.3232948E+00 7.5242456E-09 3.9514543E-10 O 93 0530-727 1991.09.10-06:53:45.0 HARTRAO 193.42235 38.94022 884.3 18.6 1.0743970E-08 1.5813684E+00 6.6181293E-09 1.4800757E-10 O 93 0530-727 1991.09.10-06:53:45.0 HOBART26 187.35852 26.63768 1010.5 10.0 1.7571376E-08 2.2195073E+00 7.5242456E-09 3.9514543E-10 O 94 0637-752 1991.09.10-07:00:37.0 HARTRAO 187.27892 39.31029 884.4 19.2 1.0659567E-08 1.5691996E+00 6.6181293E-09 1.4800757E-10 O 94 0637-752 1991.09.10-07:00:37.0 HOBART26 190.38912 30.60891 1010.5 10.0 1.5493594E-08 1.9561475E+00 7.5242456E-09 3.9514543E-10 O 95 1057-797 1991.09.10-07:06:26.0 HARTRAO 172.11881 33.14805 884.5 19.6 1.2337226E-08 1.8162078E+00 6.6181293E-09 1.4800757E-10 O 95 1057-797 1991.09.10-07:06:26.0 HOBART26 193.64957 44.03285 1010.5 10.0 1.1375816E-08 1.4356541E+00 7.5242456E-09 3.9514543E-10 O 96 1034-293 1991.09.10-07:19:53.0 HARTRAO 104.73083 60.89373 884.6 20.1 7.7413027E-09 1.1447772E+00 6.6181293E-09 1.4800757E-10 O 96 1034-293 1991.09.10-07:19:53.0 HOBART26 249.15443 21.58851 1010.4 9.9 2.1352934E-08 2.6967740E+00 7.5242456E-09 3.9514543E-10 O 97 1334-127 1991.09.10-07:29:58.0 HARTRAO 95.63301 18.68098 884.6 20.4 2.0911749E-08 3.1214984E+00 6.6181293E-09 1.4800757E-10 O 97 1334-127 1991.09.10-07:29:58.0 HOBART26 294.32554 41.46904 1010.4 9.9 1.1940973E-08 1.5079706E+00 7.5242456E-09 3.9514543E-10 O 98 0637-752 1991.09.10-07:37:37.0 HARTRAO 189.84337 38.06409 884.7 20.8 1.0951168E-08 1.6118207E+00 6.6181293E-09 1.4800757E-10 O 98 0637-752 1991.09.10-07:37:37.0 HOBART26 187.97145 29.52188 1010.3 9.8 1.6004737E-08 2.0210089E+00 7.5242456E-09 3.9514543E-10 O 99 0308-611 1991.09.10-07:45:13.0 HARTRAO 212.11507 24.64066 884.7 21.1 1.6132558E-08 2.3704767E+00 6.6181293E-09 1.4800757E-10 O 99 0308-611 1991.09.10-07:45:13.0 HOBART26 167.63653 15.80381 1010.2 9.8 2.8640822E-08 3.6373061E+00 7.5242456E-09 3.9514543E-10 O 100 1057-797 1991.09.10-07:56:38.0 HARTRAO 174.16570 34.50661 884.8 21.3 1.1911578E-08 1.7535594E+00 6.6181293E-09 1.4800757E-10 O 100 1057-797 1991.09.10-07:56:38.0 HOBART26 193.45256 41.86126 1010.2 9.7 1.1845987E-08 1.4950132E+00 7.5242456E-09 3.9514543E-10 O 101 0637-752 1991.09.10-08:02:29.0 HARTRAO 191.36028 37.03088 884.9 21.7 1.1209371E-08 1.6495875E+00 6.6181293E-09 1.4800757E-10 O 101 0637-752 1991.09.10-08:02:29.0 HOBART26 186.27479 28.95444 1010.2 9.7 1.6287512E-08 2.0569460E+00 7.5242456E-09 3.9514543E-10 O 102 1424-418 1991.09.10-08:14:16.0 HARTRAO 126.18045 26.47855 884.9 22.1 1.5102185E-08 2.2341221E+00 6.6181293E-09 1.4800757E-10 O 102 1424-418 1991.09.10-08:14:16.0 HOBART26 256.36364 58.58829 1010.1 9.6 9.2742180E-09 1.1703899E+00 7.5242456E-09 3.9514543E-10 O 103 1104-445 1991.09.10-08:23:44.0 HARTRAO 140.33967 62.88561 885.0 22.4 7.5989798E-09 1.1221744E+00 6.6181293E-09 1.4800757E-10 O 103 1104-445 1991.09.10-08:23:44.0 HOBART26 231.42508 25.34432 1010.0 9.6 1.8394119E-08 2.3213480E+00 7.5242456E-09 3.9514543E-10 O 104 0530-727 1991.09.10-08:35:25.0 HARTRAO 198.26163 32.54999 885.0 22.8 1.2536234E-08 1.8437014E+00 6.6181293E-09 1.4800757E-10 O 104 0530-727 1991.09.10-08:35:25.0 HOBART26 179.09112 25.57713 1010.0 9.5 1.8239764E-08 2.3051743E+00 7.5242456E-09 3.9514543E-10 O 105 1057-797 1991.09.10-08:45:06.0 HARTRAO 176.48566 35.40166 885.0 23.2 1.1650230E-08 1.7150289E+00 6.6181293E-09 1.4800757E-10 O 105 1057-797 1991.09.10-08:45:06.0 HOBART26 192.70230 39.83781 1010.0 9.5 1.2336881E-08 1.5570219E+00 7.5242456E-09 3.9514543E-10 O 106 0637-752 1991.09.10-08:50:57.0 HARTRAO 193.77024 34.64143 885.0 23.4 1.1871021E-08 1.7464087E+00 6.6181293E-09 1.4800757E-10 O 106 0637-752 1991.09.10-08:50:57.0 HOBART26 182.85401 28.24362 1009.9 9.4 1.6658515E-08 2.1042372E+00 7.5242456E-09 3.9514543E-10 O 107 1334-127 1991.09.10-09:01:06.0 HARTRAO 85.68107 39.20618 885.0 23.9 1.0702703E-08 1.5843540E+00 6.5998223E-09 1.7722926E-10 O 107 1334-127 1991.09.10-09:01:06.0 HOBART26 275.80668 25.32073 1009.8 9.4 1.8299395E-08 2.3103733E+00 7.5065736E-09 3.6472776E-10 O 108 1424-418 1991.09.10-09:08:16.0 HARTRAO 124.57518 36.42329 885.0 24.2 1.1388598E-08 1.6813627E+00 6.5998223E-09 1.7722926E-10 O 108 1424-418 1991.09.10-09:08:16.0 HOBART26 250.96836 49.06036 1009.7 9.4 1.0407312E-08 1.3165639E+00 7.5065736E-09 3.6472776E-10 O 109 1057-797 1991.09.10-09:15:58.0 HARTRAO 178.08188 35.73219 884.9 24.5 1.1575961E-08 1.7030104E+00 6.5998223E-09 1.7722926E-10 O 109 1057-797 1991.09.10-09:15:58.0 HOBART26 191.97170 38.62336 1009.7 9.3 1.2580271E-08 1.5915028E+00 7.5065736E-09 3.6472776E-10 O 110 1610-771 1991.09.10-09:24:44.0 HARTRAO 165.84136 26.00343 884.9 24.8 1.5377278E-08 2.2630346E+00 6.5998223E-09 1.7722926E-10 O 110 1610-771 1991.09.10-09:24:44.0 HOBART26 191.59361 52.91706 1009.6 9.3 9.8569021E-09 1.2488045E+00 7.5065736E-09 3.6472776E-10 O 111 1104-445 1991.09.10-09:35:16.0 HARTRAO 166.62794 70.45358 884.8 25.1 7.1901542E-09 1.0600090E+00 6.5998223E-09 1.7722926E-10 O 111 1104-445 1991.09.10-09:35:16.0 HOBART26 222.55642 15.71808 1009.5 9.3 2.8589553E-08 3.5871772E+00 7.5065736E-09 3.6472776E-10 O 112 1622-253 1991.09.10-09:47:46.0 HARTRAO 110.60586 16.85594 884.7 25.4 2.3076855E-08 3.4341237E+00 6.5998223E-09 1.7722926E-10 O 112 1622-253 1991.09.10-09:47:46.0 HOBART26 287.83761 55.19282 1009.5 9.3 9.5800738E-09 1.2145877E+00 7.5065736E-09 3.6472776E-10 O 113 0530-727 1991.09.10-10:01:25.0 HARTRAO 199.20867 26.24757 884.6 25.8 1.5245273E-08 2.2401212E+00 6.5998223E-09 1.7722926E-10 O 113 0530-727 1991.09.10-10:01:25.0 HOBART26 172.13801 26.79375 1009.4 9.3 1.7369940E-08 2.2009420E+00 7.5065736E-09 3.6472776E-10 O 114 0637-752 1991.09.10-10:07:29.0 HARTRAO 196.00195 30.16035 884.4 26.1 1.3438300E-08 1.9752238E+00 6.5998223E-09 1.7722926E-10 O 114 0637-752 1991.09.10-10:07:29.0 HOBART26 177.33659 28.22009 1009.3 9.2 1.6567249E-08 2.0974802E+00 7.5065736E-09 3.6472776E-10 O 115 1057-797 1991.09.10-10:13:18.0 HARTRAO 181.14200 35.82033 884.2 26.3 1.1551416E-08 1.6992184E+00 6.5998223E-09 1.7722926E-10 O 115 1057-797 1991.09.10-10:13:18.0 HOBART26 190.16898 36.59060 1009.2 9.2 1.3169153E-08 1.6658792E+00 7.5065736E-09 3.6472776E-10 O 116 1424-418 1991.09.10-10:20:56.0 HARTRAO 125.44725 49.90505 884.1 26.5 8.8514000E-09 1.3060599E+00 6.5998223E-09 1.7722926E-10 O 116 1424-418 1991.09.10-10:20:56.0 HOBART26 243.36790 36.74728 1009.2 9.2 1.3121323E-08 1.6562970E+00 7.5065736E-09 3.6472776E-10 O 117 1622-253 1991.09.10-10:28:38.0 HARTRAO 107.28677 25.57325 883.9 26.7 1.5619019E-08 2.3141935E+00 6.5998223E-09 1.7722926E-10 O 117 1622-253 1991.09.10-10:28:38.0 HOBART26 278.69350 47.87967 1009.2 9.2 1.0599646E-08 1.3423563E+00 7.5065736E-09 3.6472776E-10 O 118 1104-445 1991.09.10-10:41:16.0 HARTRAO 201.09525 69.37542 883.7 27.0 7.2395938E-09 1.0669401E+00 6.5998223E-09 1.7722926E-10 O 118 1104-445 1991.09.10-10:41:16.0 HOBART26 213.30870 8.24939 1009.1 9.2 5.1980729E-08 6.5289186E+00 7.5065736E-09 3.6472776E-10 O 119 1610-771 1991.09.10-10:51:36.0 HARTRAO 166.61509 30.72406 883.5 27.2 1.3217742E-08 1.9452234E+00 6.5998223E-09 1.7722926E-10 O 119 1610-771 1991.09.10-10:51:36.0 HOBART26 196.00730 49.03846 1009.1 9.2 1.0410265E-08 1.3181158E+00 7.5065736E-09 3.6472776E-10 O 120 1057-797 1991.09.10-11:00:26.0 HARTRAO 183.59642 35.37878 883.4 27.3 1.1675493E-08 1.7172818E+00 6.5998223E-09 1.7722926E-10 O 120 1057-797 1991.09.10-11:00:26.0 HOBART26 188.32679 35.19396 1009.0 9.2 1.3616950E-08 1.7225674E+00 7.5065736E-09 3.6472776E-10 O 121 0637-752 1991.09.10-11:06:17.0 HARTRAO 196.42411 26.43769 883.2 27.5 1.5144691E-08 2.2254563E+00 6.5998223E-09 1.7722926E-10 O 121 0637-752 1991.09.10-11:06:17.0 HOBART26 173.19632 29.11523 1008.9 9.2 1.6106241E-08 2.0405498E+00 7.5065736E-09 3.6472776E-10 O 122 1424-418 1991.09.10-11:16:04.0 HARTRAO 130.27724 59.77571 883.1 27.6 7.8398811E-09 1.1564917E+00 6.5998223E-09 1.7722926E-10 O 122 1424-418 1991.09.10-11:16:04.0 HOBART26 237.14326 27.94382 1008.9 9.2 1.6713602E-08 2.1052243E+00 7.5065736E-09 3.6472776E-10 O 123 1741-038 1991.09.10-11:29:38.0 HARTRAO 87.67471 13.54799 882.9 27.8 2.8368991E-08 4.2642317E+00 6.5998223E-09 1.7722926E-10 O 123 1741-038 1991.09.10-11:29:38.0 HOBART26 303.32627 35.52808 1008.8 9.1 1.3513738E-08 1.7140442E+00 7.5065736E-09 3.6472776E-10 O 124 1815-553 1991.09.10-11:38:04.0 HARTRAO 141.59141 24.61880 882.8 27.9 1.6174311E-08 2.3864488E+00 6.5998223E-09 1.7722926E-10 O 124 1815-553 1991.09.10-11:38:04.0 HOBART26 228.97821 63.58641 1008.8 9.1 8.7842461E-09 1.1130324E+00 7.5065736E-09 3.6472776E-10 O 125 1622-253 1991.09.10-11:45:38.0 HARTRAO 101.74733 42.38244 882.7 28.0 1.0039622E-08 1.4840360E+00 6.5998223E-09 1.7722926E-10 O 125 1622-253 1991.09.10-11:45:38.0 HOBART26 265.10405 33.75621 1008.7 9.1 1.4121912E-08 1.7834871E+00 7.5065736E-09 3.6472776E-10 O 126 1610-771 1991.09.10-11:53:36.0 HARTRAO 168.45313 33.76347 882.5 28.1 1.2159587E-08 1.7894971E+00 6.5998223E-09 1.7722926E-10 O 126 1610-771 1991.09.10-11:53:36.0 HOBART26 197.33151 45.74440 1008.7 9.1 1.0972813E-08 1.3887468E+00 7.5065736E-09 3.6472776E-10 O 127 1057-797 1991.09.10-12:02:26.0 HARTRAO 186.49587 34.13903 882.4 28.3 1.2042436E-08 1.7709489E+00 6.5998223E-09 1.7722926E-10 O 127 1057-797 1991.09.10-12:02:26.0 HOBART26 185.53252 33.81243 1008.6 9.1 1.4099361E-08 1.7838733E+00 7.5065736E-09 3.6472776E-10 O 128 1741-038 1991.09.10-12:11:18.0 HARTRAO 82.84750 22.91041 882.3 28.4 1.7296249E-08 2.5738511E+00 6.5998223E-09 1.7722926E-10 O 128 1741-038 1991.09.10-12:11:18.0 HOBART26 293.90791 28.80140 1008.6 9.0 1.6271865E-08 2.0607289E+00 7.5065736E-09 3.6472776E-10 O 129 1424-418 1991.09.10-12:23:56.0 HARTRAO 147.84403 70.07544 882.2 28.5 7.2072178E-09 1.0628389E+00 6.5998223E-09 1.7722926E-10 O 129 1424-418 1991.09.10-12:23:56.0 HOBART26 228.73229 17.98206 1008.5 9.0 2.5182522E-08 3.1614844E+00 7.5065736E-09 3.6472776E-10 O 130 1815-553 1991.09.10-12:33:24.0 HARTRAO 140.82069 32.46066 882.1 28.5 1.2588357E-08 1.8563066E+00 6.5998223E-09 1.7722926E-10 O 130 1815-553 1991.09.10-12:33:24.0 HOBART26 230.77589 55.76715 1008.5 9.0 9.5125455E-09 1.2042083E+00 7.5065736E-09 3.6472776E-10 O 131 1921-293 1991.09.10-12:39:57.0 HARTRAO 114.86119 16.88641 882.1 28.5 2.3036699E-08 3.4250780E+00 6.5998223E-09 1.7722926E-10 O 131 1921-293 1991.09.10-12:39:57.0 HOBART26 283.86131 58.64024 1008.4 9.0 9.2128211E-09 1.1680653E+00 7.5065736E-09 3.6472776E-10 O 132 1622-253 1991.09.10-12:45:06.0 HARTRAO 97.84286 55.59618 882.0 28.6 8.2093918E-09 1.2126401E+00 6.5998223E-09 1.7722926E-10 O 132 1622-253 1991.09.10-12:45:06.0 HOBART26 255.91913 22.98133 1008.4 8.9 2.0013203E-08 2.5194721E+00 7.5065736E-09 3.6472776E-10 O 133 1610-771 1991.09.10-12:53:24.0 HARTRAO 171.20740 36.16197 882.0 28.6 1.1457782E-08 1.6861616E+00 6.5998223E-09 1.7722926E-10 O 133 1610-771 1991.09.10-12:53:24.0 HOBART26 197.31932 42.45115 1008.3 8.9 1.1639790E-08 1.4725956E+00 7.5065736E-09 3.6472776E-10 O 134 1958-179 1991.09.10-13:02:49.0 HARTRAO 105.21450 9.70561 882.0 28.6 3.8711131E-08 5.8604944E+00 6.5998223E-09 1.7722926E-10 O 134 1958-179 1991.09.10-13:02:49.0 HOBART26 302.59128 53.11860 1008.3 8.9 9.8338161E-09 1.2477740E+00 7.5065736E-09 3.6472776E-10 O 135 1741-038 1991.09.10-13:23:06.0 HARTRAO 72.89346 38.73618 881.9 28.6 1.0811429E-08 1.6018467E+00 6.5998223E-09 1.7722926E-10 O 135 1741-038 1991.09.10-13:23:06.0 HOBART26 280.02357 16.18853 1008.2 8.8 2.7831378E-08 3.5132550E+00 7.5065736E-09 3.6472776E-10 O 136 1424-418 1991.09.10-13:41:44.0 HARTRAO 193.90610 73.22827 881.9 28.6 7.0771199E-09 1.0432517E+00 6.5998223E-09 1.7722926E-10 O 136 1424-418 1991.09.10-13:41:44.0 HOBART26 217.83709 8.16420 1008.1 8.8 5.2466741E-08 6.5830581E+00 7.5065736E-09 3.6472776E-10 O 137 1057-797 1991.09.10-13:49:26.0 HARTRAO 189.99252 30.60233 881.8 28.6 1.3264324E-08 1.9499602E+00 6.5998223E-09 1.7722926E-10 O 137 1057-797 1991.09.10-13:49:26.0 HOBART26 180.14662 32.82575 1008.0 8.8 1.4470926E-08 1.8319215E+00 7.5065736E-09 3.6472776E-10 O 138 1622-253 1991.09.10-13:56:46.0 HARTRAO 93.06418 71.67979 881.8 28.6 7.1380370E-09 1.0538153E+00 6.5998223E-09 1.7722926E-10 O 138 1622-253 1991.09.10-13:56:46.0 HOBART26 244.99059 10.57634 1008.0 8.7 4.1454574E-08 5.1932954E+00 7.5065736E-09 3.6472776E-10 TROPO_PATH_DELAY Exchange format v 1.2_TUVienna Format version of 2014.07.10