TROPO_PATH_DELAY Exchange format v 1.2_TUVienna Format version of 2014.07.10 # # This file contains tropospheric slant and zenith path delays and wet mapping factor. # # Created by: Armin Hofmeister, Technische Universität Wien # # Created with RADIATE program developed by Armin Hofmeister # Version: 2.0_Fortran # Subversion: global_limit # # File created on: # 2018-07-25 | 15:27:25.345 # # Data content: # Ray-tracing results for session: # 90MAR20XJ##### # Total number of observations: # 67 # Total number of different observing stations: # 3 # # Chosen ray-tracing options: # Assignment of observations to the epochs of the numerical weather model: # one_epoch_per_obs # Method of vertical interpolation (horizontal treatment): # profilewise # Method of numerical weather model usage: # Full grid information used. # Ray-tracing approach: # pwl # Station coordinate catalogue-file: # vlbi.ell # # Numerical weather model used: # Epoch 1: 1990032018 | Grib-file resolution: res_lat= 1.000 deg, res_lon= 1.000 deg # # Origin and use of the observational data: # Observational data (scan number, source, observation time, site, azimuth, elevation) # as well as pressure- and temperature-values provided in this file originate from the # AzEl-file created by VieVS. # The reported pressure- and temperature-values have not been used for the ray-tracing. # Ray-tracing used temperature- and pressure-values only from the numerical weather # model and the standard atmosphere model. # # # --------------------------------------------------------------------------------------- # ----------------------------------- File description ---------------------------------- # --------------------------------------------------------------------------------------- # # 1) Header record -- the first record line should have a signature: # TROPO_PATH_DELAY Exchange format v N.N_additional Format version of YYYY.MM.DD # stating the version and date of the format # # The header record allows to distinguish a valid file in the TROPO_PATH_DELAY # format from files in other formats. # # 2) E-records section # E-record has letter E in the first field. # It specifies the experiment name. # # 3) H-records section # H-record has letter H in the first field. # It specifies the secondary experiment name. # # 4) M-records section # M-record has letter M in the first field. # The M record keeps the model identifier. # # 5) U-records section # U-record has letter U in the first field. # The U record instructs analysis software how to use the data. # Analysis software may override this recommendation. # # 6) S-records section # S-record has letter S in the first field. # It defines the name and coordinates of each site. A site cannot be # defined more than once. # # 7) O-records section # O-record has letter O in the first field. # It defines the circumstances of the observation: # the time tag, site ID, azimuth and elevation in the local # topocentric coordinate system, surface atmospheric pressure and # surface air temperature, slant and zenith path delay and # wet mapping factor. # # Records, which start from # character, are considered as comments. # # Format of an S-record: # ---------------------- # # Field 1:1 A1 -- Record ID. Should be letter S. # field 2:3 a2 delimiter: blanks. # Field 4:11 A8 -- 8-letter long site identifier. # May contain any characters with decimal codes 32-255, but # blanks are allowed only at the end of the site identifier. # This site identifier should be unique among S-records. # This field should not necessarily have a special meaning. # field 12:13 a2 delimiter: blanks. # Field 14:26 F13.4 -- X site coordinate in a crust fixed reference frame. # Unit: meter # field 27:27 a1 delimiter: blank. # Field 28:40 F13.4 -- Y site coordinate in a crust fixed reference frame. # Unit: meter # field 41:41 a1 delimiter: blank. # Field 42:54 F13.4 -- Z site coordinate in a crust fixed reference frame. # Unit: meter # field 55:56 a2 delimiter: blanks. # Field 57:64 F8.4 -- Geodetic latitude of site, # interval: [-90; 90], positive to north. # Unit: degree # field 65:65 a1 delimiter: blank. # Field 66:73 F8.4 -- Geodetic longitude of site, # interval: [0; 360[, increasing towards east. # Unit: degree # field 74:74 a1 delimiter: blank. # Field 75:81 F7.2 -- Height of site above the reference ellipsoid. # Unit: meter # # Format of an O-record: # ---------------------- # # Field 1:1 A1 -- Record ID. Should be letter O. # field 2:3 a2 delimiter: blanks. # Field 4:8 I5 -- Scan number # field 9:12 a4 delimiter: blanks. # Field 13:20 A8 -- Source name # field 21:25 a5 delimiter: blanks. # Field 26:46 A21 -- Calendar date in TAI in YYYY.MM.DD-hh:mm:ss.s format # Calendar date format: # field 26:29 -- I4 Year # field 30:30 -- a1 delimiter: . # field 31:32 -- I2 Month # field 33:33 -- a1 delimiter: . # field 34:35 -- I2 Day # field 36:36 -- a1 delimiter: - # field 37:38 -- I2 Hour # field 39:39 -- a1 delimiter: : # field 40:41 -- I2 Minute # field 42:42 -- a1 delimiter: : # field 43:46 -- F4.1 Seconds # field 47:48 a2 delimiter: blanks. # Field 49:56 A8 -- Site identifier # field 57:58 a2 delimiter: blanks. # Field 59:67 F9.5 -- Azimuth # Unit: degree # field 68:68 a1 delimiter: blank. # Field 69:76 F8.5 -- Elevation angle (outgoing) # Unit: degree # field 77:78 a2 delimiter: blanks. # Field 79:84 F6.1 -- Atmospheric surface pressure # Unit: hPa (mbar) # field 85:85 a1 delimiter: blank. # Field 86:90 F5.1 -- Surface air temperature # Unit: degree Celsius # field 91:92 a2 delimiter: blanks. # Field 93:107 1PD15.7 -- Slant total delay # Unit: seconds of time # field 108:108 a1 delimiter: blank. # Field 109:123 1PD15.7 -- Wet mapping factor # Tilting of the wet part of the atmosphere in the form # of a wet mapping function: # [wet_delay_along_the_path / wet_zenith_delay] # field 124:124 a1 delimiter: blank. # Field 125:139 1PD15.7 -- Hydrostatic zenith delay # Unit: seconds of time # field 140:140 a1 delimiter: blank. # Field 141:155 1PD15.7 -- Wet zenith delay # Unit: seconds of time # ####################################################################################################### # E $90MAR20XJ##### H $90MAR20XJ##### # M Ray-tracing results from RADIATE program (version: 2.0_Fortran, subversion: global_limit, created: 2018-07-25 15:27:25.345) developed by Armin Hofmeister, Technische Universität Wien. # U NONE # # Site| X-coordinate| Y-coordinate| Z-coordinate| Latitude| Longit.| Height S GILCREEK -2281548.0110 -1453646.3453 5756992.5699 64.9784 212.5025 332.07 S KAUAI -5543847.3270 -2054560.1965 2387814.1403 22.1263 200.3348 1168.32 S RICHMOND 961258.7277 -5674087.8800 2740538.0744 25.6138 279.6153 -13.61 # # # Scan| Source| Time tag in TAI| Site| Azimuth| Elev.| Pres.|Temp.| Slant total del|Wet map. factor|Hydr zenith del|Wet zenith del. O 1 2216-038 1990.03.20-17:42:58.0 GILCREEK 139.92990 15.86858 998.7 -5.7 2.7583022E-08 3.5735181E+00 7.5585889E-09 9.4419188E-11 O 1 2216-038 1990.03.20-17:42:58.0 KAUAI 111.14426 34.32555 888.4 12.4 1.2332645E-08 1.7761449E+00 6.7614535E-09 2.0989348E-10 O 1 2216-038 1990.03.20-17:42:58.0 RICHMOND 227.79536 49.58643 1017.5 24.5 1.0967564E-08 1.3108723E+00 7.7451466E-09 6.1303946E-10 O 2 2255-282 1990.03.20-17:50:04.0 KAUAI 128.95661 14.46674 888.4 12.4 2.7437055E-08 4.0104388E+00 6.7614535E-09 2.0989348E-10 O 2 2255-282 1990.03.20-17:50:04.0 RICHMOND 201.82683 32.77021 1017.5 24.6 1.5401904E-08 1.8486745E+00 7.7451466E-09 6.1303946E-10 O 3 1548+056 1990.03.20-17:57:38.0 GILCREEK 246.81621 16.35880 998.7 -5.3 2.6820732E-08 3.5108976E+00 7.5585889E-09 9.4419188E-11 O 3 1548+056 1990.03.20-17:57:38.0 KAUAI 258.79808 38.75596 888.5 12.5 1.1116780E-08 1.5953454E+00 6.7614535E-09 2.0989348E-10 O 4 0133+476 1990.03.20-18:12:24.0 KAUAI 43.86457 14.50311 888.5 12.5 2.7337367E-08 3.9521677E+00 6.7614535E-09 2.0989348E-10 O 4 0133+476 1990.03.20-18:12:24.0 RICHMOND 21.91692 65.43754 1017.3 24.7 9.1866394E-09 1.0986921E+00 7.7451466E-09 6.1303946E-10 O 5 2216-038 1990.03.20-18:19:46.0 GILCREEK 149.26428 18.12769 998.7 -4.5 2.4325716E-08 3.1499154E+00 7.5585889E-09 9.4419188E-11 O 5 2216-038 1990.03.20-18:19:46.0 RICHMOND 237.10297 42.98126 1017.3 24.8 1.2240952E-08 1.4613914E+00 7.7451466E-09 6.1303946E-10 O 6 2345-167 1990.03.20-18:25:18.0 KAUAI 117.03530 17.85783 888.6 12.6 2.2484518E-08 3.2662291E+00 6.7614535E-09 2.0989348E-10 O 6 2345-167 1990.03.20-18:25:18.0 RICHMOND 203.31285 44.65258 1017.2 24.8 1.1880160E-08 1.4236667E+00 7.7451466E-09 6.1303946E-10 O 7 1548+056 1990.03.20-18:31:26.0 GILCREEK 254.80484 12.97655 998.7 -4.1 3.3378486E-08 4.3911967E+00 7.5585889E-09 9.4419188E-11 O 7 1548+056 1990.03.20-18:31:26.0 KAUAI 262.86753 31.00755 888.6 12.6 1.3489443E-08 1.9366535E+00 6.7614535E-09 2.0989348E-10 O 8 0106+013 1990.03.20-18:37:58.0 GILCREEK 110.41705 10.91592 998.7 -3.9 3.9198001E-08 5.1199500E+00 7.5585889E-09 9.4419188E-11 O 8 0106+013 1990.03.20-18:37:58.0 KAUAI 92.68062 10.60235 888.6 12.6 3.6696253E-08 5.3992003E+00 6.7614535E-09 2.0989348E-10 O 8 0106+013 1990.03.20-18:37:58.0 RICHMOND 180.26011 65.91691 1017.2 24.9 9.1544364E-09 1.0970388E+00 7.7451466E-09 6.1303946E-10 O 9 0119+041 1990.03.20-18:43:26.0 GILCREEK 107.44810 12.69183 998.7 -3.6 3.4046316E-08 4.4472031E+00 7.5585889E-09 9.4419188E-11 O 9 0119+041 1990.03.20-18:43:26.0 KAUAI 89.30848 9.83703 888.6 12.6 3.9323056E-08 5.8014551E+00 6.7614535E-09 2.0989348E-10 O 9 0119+041 1990.03.20-18:43:26.0 RICHMOND 174.93666 68.63479 1017.1 25.0 8.9747727E-09 1.0754805E+00 7.7451466E-09 6.1303946E-10 O 10 2216-038 1990.03.20-18:48:58.0 GILCREEK 156.83970 19.53030 998.7 -3.4 2.2676664E-08 2.9360436E+00 7.5585889E-09 9.4419188E-11 O 10 2216-038 1990.03.20-18:48:58.0 KAUAI 123.60830 47.96585 888.7 12.6 9.3779151E-09 1.3483675E+00 6.7614535E-09 2.0989348E-10 O 10 2216-038 1990.03.20-18:48:58.0 RICHMOND 243.04861 37.25805 1017.1 25.0 1.3773821E-08 1.6426616E+00 7.7451466E-09 6.1303946E-10 O 11 1418+546 1990.03.20-18:54:26.0 GILCREEK 306.77010 44.21452 998.7 -3.2 1.0962023E-08 1.4377086E+00 7.5585889E-09 9.4419188E-11 O 11 1418+546 1990.03.20-18:54:26.0 KAUAI 321.95403 19.48085 888.7 12.7 2.0695547E-08 2.9679801E+00 6.7614535E-09 2.0989348E-10 O 12 0552+398 1990.03.20-18:59:58.0 GILCREEK 36.86713 20.97515 998.7 -3.0 2.1205423E-08 2.7947764E+00 7.5585889E-09 9.4419188E-11 O 12 0552+398 1990.03.20-18:59:58.0 RICHMOND 57.76707 33.91094 1017.0 25.1 1.4945132E-08 1.7976756E+00 7.7451466E-09 6.1303946E-10 O 13 0202+149 1990.03.20-19:06:18.0 GILCREEK 98.04102 20.50690 998.7 -2.8 2.1657248E-08 2.8297746E+00 7.5585889E-09 9.4419188E-11 O 13 0202+149 1990.03.20-19:06:18.0 KAUAI 77.23754 9.16605 888.7 12.7 4.1939673E-08 6.1924503E+00 6.7614535E-09 2.0989348E-10 O 13 0202+149 1990.03.20-19:06:18.0 RICHMOND 147.17154 77.77335 1017.0 25.2 8.5526950E-09 1.0245709E+00 7.7451466E-09 6.1303946E-10 O 14 2216-038 1990.03.20-19:12:06.0 GILCREEK 162.93136 20.37366 998.7 -2.7 2.1793691E-08 2.8217787E+00 7.5585889E-09 9.4419188E-11 O 14 2216-038 1990.03.20-19:12:06.0 KAUAI 129.63320 52.28078 888.7 12.7 8.8079038E-09 1.2659995E+00 6.7614535E-09 2.0989348E-10 O 14 2216-038 1990.03.20-19:12:06.0 RICHMOND 247.09514 32.51532 1017.0 25.2 1.5498076E-08 1.8465075E+00 7.7451466E-09 6.1303946E-10 O 15 2345-167 1990.03.20-19:17:38.0 KAUAI 124.65999 28.30142 888.8 12.7 1.4647297E-08 2.1141474E+00 6.7614535E-09 2.0989348E-10 O 15 2345-167 1990.03.20-19:17:38.0 RICHMOND 218.07934 38.58117 1016.9 25.3 1.3378101E-08 1.6008115E+00 7.7451466E-09 6.1303946E-10 O 16 CTA102 1990.03.20-19:23:06.0 GILCREEK 159.80353 35.46306 998.7 -2.4 1.3158768E-08 1.7099049E+00 7.5585889E-09 9.4419188E-11 O 16 CTA102 1990.03.20-19:23:06.0 KAUAI 106.00433 60.55077 888.8 12.7 8.0029403E-09 1.1492210E+00 6.7614535E-09 2.0989348E-10 O 16 CTA102 1990.03.20-19:23:06.0 RICHMOND 263.41146 40.54760 1016.9 25.3 1.2830667E-08 1.5275854E+00 7.7451466E-09 6.1303946E-10 O 17 1611+343 1990.03.20-19:28:38.0 GILCREEK 277.01784 35.03646 998.6 -2.2 1.3301120E-08 1.7428190E+00 7.5585889E-09 9.4419188E-11 O 17 1611+343 1990.03.20-19:28:38.0 KAUAI 297.71959 30.55369 888.8 12.7 1.3664336E-08 1.9583415E+00 6.7614535E-09 2.0989348E-10 O 18 0202+149 1990.03.20-19:34:46.0 GILCREEK 104.74962 23.46416 998.6 -2.0 1.9095504E-08 2.4909970E+00 7.5585889E-09 9.4419188E-11 O 18 0202+149 1990.03.20-19:34:46.0 KAUAI 79.63662 15.64220 888.8 12.7 2.5468702E-08 3.6951749E+00 6.7614535E-09 2.0989348E-10 O 18 0202+149 1990.03.20-19:34:46.0 RICHMOND 181.61915 79.57274 1016.8 25.4 8.4987640E-09 1.0174423E+00 7.7451466E-09 6.1303946E-10 O 19 2216-038 1990.03.20-19:40:38.0 GILCREEK 170.52799 21.06794 998.6 -1.8 2.1119968E-08 2.7348916E+00 7.5585889E-09 9.4419188E-11 O 19 2216-038 1990.03.20-19:40:38.0 KAUAI 138.86043 57.03718 888.9 12.8 8.3057471E-09 1.1934531E+00 6.7614535E-09 2.0989348E-10 O 19 2216-038 1990.03.20-19:40:38.0 RICHMOND 251.48235 26.48175 1016.8 25.5 1.8644233E-08 2.2182056E+00 7.7451466E-09 6.1303946E-10 O 20 0133+476 1990.03.20-19:49:24.0 GILCREEK 92.62355 56.05719 998.6 -1.5 9.2192284E-09 1.2042228E+00 7.5585889E-09 9.4419188E-11 O 20 0133+476 1990.03.20-19:49:24.0 KAUAI 46.46692 30.58907 888.9 12.8 1.3647871E-08 1.9597247E+00 6.7614535E-09 2.0989348E-10 O 21 0300+470 1990.03.20-19:56:38.0 GILCREEK 76.22821 47.29370 998.6 -1.3 1.0402901E-08 1.3605245E+00 7.5585889E-09 9.4419188E-11 O 21 0300+470 1990.03.20-19:56:38.0 KAUAI 45.28812 17.26953 888.9 12.8 2.3184691E-08 3.3433321E+00 6.7614535E-09 2.0989348E-10 O 21 0300+470 1990.03.20-19:56:38.0 RICHMOND 15.71156 67.26667 1016.7 25.7 9.0593177E-09 1.0831875E+00 7.7451466E-09 6.1303946E-10 O 22 0552+398 1990.03.20-20:02:18.0 GILCREEK 48.96857 25.46755 998.6 -1.1 1.7702058E-08 2.3262404E+00 7.5585889E-09 9.4419188E-11 O 22 0552+398 1990.03.20-20:02:18.0 RICHMOND 58.28663 45.89146 1016.7 25.8 1.1629175E-08 1.3958714E+00 7.7451466E-09 6.1303946E-10 O 23 CTA102 1990.03.20-20:10:26.0 GILCREEK 174.11619 36.59503 998.6 -0.9 1.2809047E-08 1.6645926E+00 7.5585889E-09 9.4419188E-11 O 23 CTA102 1990.03.20-20:10:26.0 RICHMOND 269.05345 29.87440 1016.6 25.9 1.6707831E-08 1.9843500E+00 7.7451466E-09 6.1303946E-10 O 24 2345-167 1990.03.20-20:15:58.0 KAUAI 136.02034 38.65609 888.9 12.8 1.1142103E-08 1.6044139E+00 6.7614535E-09 2.0989348E-10 O 24 2345-167 1990.03.20-20:15:58.0 RICHMOND 230.79582 29.31877 1016.6 25.9 1.7002133E-08 2.0307556E+00 7.7451466E-09 6.1303946E-10 O 25 0235+164 1990.03.20-20:21:26.0 GILCREEK 107.22327 26.04021 998.6 -0.6 1.7342650E-08 2.2613229E+00 7.5585889E-09 9.4419188E-11 O 25 0235+164 1990.03.20-20:21:26.0 KAUAI 79.31410 19.04603 889.0 12.8 2.1149126E-08 3.0577119E+00 6.7614535E-09 2.0989348E-10 O 26 1611+343 1990.03.20-20:27:46.0 GILCREEK 289.56454 28.94802 998.6 -0.5 1.5754465E-08 2.0696215E+00 7.5585889E-09 9.4419188E-11 O 26 1611+343 1990.03.20-20:27:46.0 KAUAI 300.27644 18.53012 889.0 12.8 2.1699458E-08 3.1159688E+00 6.7614535E-09 2.0989348E-10 O 27 0133+476 1990.03.20-20:36:36.0 GILCREEK 104.57351 60.99864 998.6 -0.3 8.7463771E-09 1.1418907E+00 7.5585889E-09 9.4419188E-11 O 27 0133+476 1990.03.20-20:36:36.0 RICHMOND 326.99083 61.47538 1016.5 26.1 9.5067501E-09 1.1340880E+00 7.7451466E-09 6.1303946E-10 O 28 0106+013 1990.03.20-20:43:46.0 GILCREEK 141.39111 21.62620 998.6 -0.2 2.0606146E-08 2.6728362E+00 7.5585889E-09 9.4419188E-11 O 28 0106+013 1990.03.20-20:43:46.0 KAUAI 107.22155 39.34792 889.0 12.7 1.0976588E-08 1.5792311E+00 6.7614535E-09 2.0989348E-10 O 28 0106+013 1990.03.20-20:43:46.0 RICHMOND 236.75113 51.16480 1016.5 26.2 1.0720486E-08 1.2804307E+00 7.7451466E-09 6.1303946E-10 TROPO_PATH_DELAY Exchange format v 1.2_TUVienna Format version of 2014.07.10